BLD12-01487
| FIRE-Final Inspection | 8/27/2013 | 8/27/2013 | 8/27/2013 3:59:58 PM | P | PART |
|
|
Lube Bay and Car Wash life safety complete. The fire door between the Lube Bay and the existing shop area shall remain locked until door has been tested and passed. As of now there are no "links" for activation installed on both sides of the wall at the roof deck as required in NFPA 80.
|
BLD13-02201
| FIRE-Final Inspection | 8/20/2013 | 8/27/2013 | 8/27/2013 3:41:40 PM | P | PASS |
|
|
Life safety passed
|
FIR13-00268
| INSP-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 3:39:42 PM | P | CANC |
|
|
Overbooked. I spoke to ray about rescheduling. Phone #: ###-####
|
FIR12-00490
| INSP-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 3:07:16 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00610
| INSP-Sprinkler Rough-in/Hydro | 8/27/2013 | 8/27/2013 | 8/27/2013 2:37:07 PM | P | FAIL |
|
|
Overhead hydro test failed due to visible pressure loss on the guage.
|
BLD13-01583
| FIRE-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 1:48:23 PM | A | PASS |
|
|
Life safety passed.
|
BLD13-02004
| FIRE-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 1:09:09 PM | A | FAIL |
|
|
Repair the exit signs as marked on the plans. Provide annual inspection for the fire exitinguishers. Lower the fire extinguisher in the south east corner of the ware house so as not to exceed 5' AFF.
|
FIR12-00380
| FIR-Aging Inspection | 8/27/2013 | 8/27/2013 | 8/27/2013 12:31:00 PM | | NR |
|
|
work is in progress
|
FIR13-00341
| INSP-Sprinkler Rough-in/Hydro | 8/26/2013 | 8/27/2013 | 8/27/2013 9:57:27 AM | A | PASS |
|
|
Inspection was for a cover of the underground piping. Piping can be covered. 2" poly like the others.
|
FIR13-00320
| INSP-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 9:37:56 AM | A | FAIL |
|
|
Alot of ceiling tile is missing and needs to be installed prior to a final sign off.
|
BLD13-01743
| FIRE-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 9:30:28 AM | A | PASS |
|
|
Life safety passed
|
FIR13-00356
| INSP-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 9:29:17 AM | A | PASS |
|
|
permit finaled
|
FIR13-00356
| INSP-Sprinkler Rough-in | 8/26/2013 | 8/27/2013 | 8/27/2013 9:28:14 AM | A | PASS |
|
|
rough-in passed.
|
FIR13-00250
| INSP-Sprinkler Rough-in/Hydro | 8/26/2013 | 8/27/2013 | 8/27/2013 12:00:00 AM | P | DONE |
|
|
Underground hydro passed
|