Inspections for the day of: Wednesday, August 9, 2017.
Number of inspections: 18
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01167 General Inspection8/3/20178/7/2017 P 
ESC16-00406 General Inspection8/9/20178/9/20178/16/2017 9:02:23 AM CANC
ESC16-01599 General Inspection8/9/20178/9/20178/14/2017 2:25:24 PM CANC
ESC15-01543 General Inspection8/9/20178/9/20178/14/2017 11:32:38 AM PASS
ESC16-01274 Aging Inspection8/9/20178/9/20178/14/2017 11:03:35 AM PASS
ESC16-00523 Site Final8/4/20178/9/20178/14/2017 10:25:10 AMAPASS
Construction complete, no temp BMPs remaining. ESC permit conditions satisfied.
ESC16-00096 General Inspection8/8/20178/9/20178/14/2017 10:22:30 AMPPEND
ESC11-00879 General Inspection8/9/20178/9/20178/11/2017 11:43:21 AM CANC
ESC16-01370 General Inspection8/9/20178/9/20178/11/2017 11:01:14 AM CANC
ESC16-01232 General Inspection8/9/20178/9/20178/11/2017 10:59:51 AM CANC
ESC16-01593 General Inspection8/9/20178/9/20178/10/2017 10:26:53 AM CANC
ESC16-01327 Aging Inspection8/9/20178/9/20178/10/2017 10:20:49 AM CANC
ESC16-01372 General Inspection8/9/20178/9/20178/9/2017 4:45:28 PM CANC
ESC16-01161 Aging Inspection8/9/20178/9/20178/9/2017 4:45:02 PM CANC
ESC16-01383 General Inspection8/9/20178/9/20178/9/2017 4:44:49 PM CANC
ESC16-01008 Aging Inspection8/9/20178/9/20178/9/2017 4:44:30 PM CANC
ESC16-01160 Aging Inspection8/9/20178/9/20178/9/2017 4:41:39 PM CANC
ESC17-00842 Site Preparation8/8/20178/9/20178/9/2017 2:01:21 PMAPASS
11 AM requested

ESC permit sign and SWPPP posted on site. RP and developer attended walk through with the BMP installation foreman.

Silt fence installed along the west perimeter of to protect drainage area and contain sediment. On the southwest corner of site where there is a natural flow line/drainage into the existing residential homes, a J-hooked silt fence will be installed as well as wattles coming down slope to the right of the site entrance. L3 is to bring construction entrance rock when they begin grading tomorrow or Friday.

Approved for construction. Post grading inspection scheduled to check on additional BMPs or potential issues once land has been disturbed.