Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-01395 FIRE-Final Inspection9/12/20139/12/20139/12/2013 3:38:24 PMPPASS
life safety passed
FIR13-00359 INSP-Sprinkler Rough-in9/12/20139/12/20139/12/2013 2:59:31 PMPPASS
The pipe routing now matches the plan modifications. Still need a tenting inspection on the third floor. Overspaced pendants on the first and second floors have been corrected.
FIR13-00359 INSP-Sprinkler Rough-in/Hydro9/12/20139/12/20139/12/2013 2:53:45 PMPPASS
Overhead hydro passed for all floors.
FIR13-00344 INSP-Supply line flush9/11/20139/12/20139/12/2013 2:49:56 PMAFAIL
United water has not turned on the water supply yet
BLD13-02422 FIRE-Final Inspection9/11/20139/12/20139/12/2013 1:37:53 PMPPASS
Life safety passed.
FIR13-00344 INSP-Sprinkler Rough-in/Hydro9/11/20139/12/20139/12/2013 12:29:40 PMACANC
The underground hydro passed
BLD13-01834 FIRE-Final Inspection9/11/20139/12/20139/12/2013 10:30:26 AMPFAIL
ron is going to reschedule for tomorrow since there are no approved plans on site.