Inspections for the day of: Thursday, September 12, 2019.
Number of inspections: 30
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01821 BLD-Final9/11/20199/12/20199/12/2019 5:14:36 PMPFAIL
Need to install railing at double door...
Temp glazing needed at bathroom...
BLD19-01095 BLD-Framing/Rough-in9/11/20199/12/20199/12/2019 5:12:29 PMPFAIL
Per plans- 6x6 DF #1 posts to bear down to foundation, supporting glue lam at garage...
Per shear inspections walk thru, #3 shear walls to be blocked...
Per plans- Stairway header to be (2)1.75x 18" LvL
Provide Engineering for as built...
Per plans- 2x Ledger to be attached with (2) 1/4x 4 1/2" SDS screws...
BLD19-02661 BLD-Foundation9/12/20199/12/20199/12/2019 5:07:21 PMPPASS
Work in progress...
BLD19-01852 BLD-Framing/Rough-in9/11/20199/12/20199/12/2019 5:07:05 PMPFAIL
Corrections not complete...
Provide Engineering approval for cut top trusses, see red paint, first floor living room...
BLD19-01799 BLD-Foundation9/12/20199/12/20199/12/2019 5:05:29 PMPPASS
Work in progress...
BLD19-01798 BLD-Foundation9/12/20199/12/20199/12/2019 5:05:18 PMPPASS
Work in progress...
BLD19-01797 BLD-Foundation9/12/20199/12/20199/12/2019 5:05:07 PMPPASS
Work in progress...
BLD19-01776 BLD-Foundation9/12/20199/12/20199/12/2019 5:04:56 PMPPASS
Work in progress...
BLD18-01702 BLD-Final9/12/20199/12/20199/12/2019 5:04:38 PMPPASS
Phone #: ###-#### Inspection requested via web by Laz Ponce
BLD18-01702 DOC - Permit Finaled9/12/20199/12/20199/12/2019 5:04:32 PMPPASS
BLD18-01702 BLD-Blower Door Test Results9/12/20199/12/20199/12/2019 5:04:00 PMPDONE
ACH50- 4.26
BLD18-03790 BLD-Final9/11/20199/12/20199/12/2019 5:02:58 PMPFAIL
Smoke/ Carbon detectors all need to be interconnected and working...
Landing at Deck and Garage man door- floor not more than 7 3/4" below threshold...
BLD19-03073 BLD-Final9/11/20199/12/20199/12/2019 12:08:21 PMPNR
Alicia Phone #: ###-####
BLD19-00883 BLD-Energy code compliance9/11/20199/12/20199/12/2019 11:41:42 AMAPASS
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD19-02213 BLD-Wall Bracing9/11/20199/12/20199/12/2019 11:28:03 AMAPASS
Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD19-03389 BLD-Footing9/11/20199/12/20199/12/2019 11:27:51 AMAPASS
John Phone #: ###-####
BLD19-02707 BLD-Conference9/11/20199/12/20199/12/2019 11:23:41 AMAPASS
Footing...
BLD19-01586 BLD-Energy code compliance9/11/20199/12/20199/12/2019 11:23:13 AMAPASS
Bob Phone #: ###-####
BLD19-01586 BLD-Framing/Rough-in9/11/20199/12/20199/12/2019 11:23:03 AMAPASS
Bob Phone #: ###-####
BLD18-01704 BLD-Final9/12/20199/12/20199/12/2019 11:22:50 AMPPASS
Phone #: ###-#### Inspection requested via web by Laz Ponce
BLD18-01704 DOC - Permit Finaled9/12/20199/12/20199/12/2019 11:22:38 AMPPASS
BLD18-01704 BLD-Blower Door Test Results9/12/20199/12/20199/12/2019 11:22:21 AMPDONE
ACH50- 4.1
BLD19-02402 BLD-Final9/12/20199/12/20199/12/2019 11:04:42 AMPPASS
Eric Phone #: ###-####
BLD19-02402 DOC - Permit Finaled9/12/20199/12/20199/12/2019 11:04:26 AMPPASS
MIS15-00234 MIS-Aging Inspection9/12/20199/12/20199/12/2019 10:46:38 AM DEFR
No word from Hot Topic
BLD18-02101 BLD-Aging Inspection9/12/20199/12/20199/12/2019 10:41:24 AM DEFR
BLD18-02101 Extend Permit 90/180 days9/12/20199/12/20199/12/2019 10:41:06 AMPDONE
BLD18-00632 BLD-Conference9/11/20199/12/20199/12/2019 8:32:24 AMACANC
Jim Phone #: ###-####
BLD19-03073 BLD-Final9/11/20199/12/20199/12/2019 8:22:50 AMADEFR
Alisia Phone #: ###-####
BLD19-02669 BLD-Footing9/11/20199/12/20199/11/2019 3:16:05 PMACANC
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru Inspection cancelled via mobile web on Wednesday, September 11, 2019.