Inspections for the day of: Friday, September 14, 2018.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00363 BLD-Conference9/14/20189/14/20189/17/2018 2:35:40 PMPPEND
Lori with EPA called-this is 1109 & 1111 is doing work w/o permits working off old permits
BLD18-02503 BLD-Conference9/13/20189/14/20189/17/2018 6:15:13 AMPPASS
Brian Phone #: ###-#### this was a framing inspection
BLD18-02674 BLD-Framing/Rough-in9/14/20189/14/20189/17/2018 6:14:19 AMPPART
Please call ahead for access, 1hr - Kurt Phone #: ###-#### ok to insulate needs point load tras in crawl space pads and post
BLD18-01688 BLD-Final9/13/20189/14/20189/17/2018 6:11:48 AMPPASS
Jason Phone #: ###-####
BLD18-00670 BLD-Foundation9/14/20189/14/20189/14/2018 2:43:32 PMPPASS
retaining walls // Alvaro Phone #: ###-####
BLD18-02777 BLD-Foundation9/14/20189/14/20189/14/2018 2:19:47 PMPPASS
Pouring at 2 - Trent Phone #: ###-####
BLD18-02777 BLD-Footing9/14/20189/14/20189/14/2018 2:19:36 PMPPASS
Trent Phone #: ###-####
BLD18-02387 BLD-Framing/Rough-in9/13/20189/14/20189/14/2018 1:38:30 PMPPASS
Metal stud TI space 1st floor, Elec Insp already requested for am Friday. Phone #: ###-#### Inspection requested via web by Mark Steen
BLD18-02649 BLD-Framing/Rough-in9/14/20189/14/20189/14/2018 1:18:42 PMPPASS
please call when on way if need him to be on site// John Engleman Phone #: ###-####
BLD18-01193 BLD-Framing/Rough-in9/14/20189/14/20189/14/2018 12:53:06 PMPPASS
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD18-00792 BLD-Other9/14/20189/14/20189/14/2018 12:41:27 PMPDONE
Don-soffits Phone #: ###-####
BLD17-04351 BLD-Framing/Rough-in9/13/20189/14/20189/14/2018 12:41:09 PMAPASS
Inspection is for exterior type x fire barriers Phone #: ###-#### Inspection requested via web by kevin debelloy
MIS18-00362 BLD-Conference9/13/20189/14/20189/14/2018 12:40:36 PMAPASS
no work that needs a permit
BLD17-04465 BLD-Wall Bracing9/14/20189/14/20189/14/2018 11:36:47 AMAPART
Exterior Shear inspection of 2nd ; 3rd floor walls soon to be concealed behind masonry pilasters between gridlines 10 and 6 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD18-01876 BLD-Framing/Rough-in9/13/20189/14/20189/14/2018 11:36:27 AMANR
Chris Phone #: ###-#### needs air seal and strape top plates ok to spray foam
BLD18-01731 BLD-Framing/Rough-in9/13/20189/14/20189/14/2018 8:54:42 AMAPASS
call before to meet // Will Mitchell Phone #: ###-#### ok to insulate needs to add studs uner three ply trusses and roll block high truss heals
BLD17-04413 BLD-Foundation9/13/20189/14/20189/14/2018 8:53:54 AMACANC
Masonry Rebar inspection for C5 in Centennial site Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD18-02380 BLD-Framing/Rough-in9/13/20189/14/20189/14/2018 8:36:17 AMACANC
Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
BLD18-02190 DOC - Permit Finaled9/14/20189/14/20189/14/2018 8:25:30 AMPPASS
BLD18-01896 BLD-Framing/Rough-in9/13/20189/14/20189/14/2018 8:19:07 AMAPASS
George Phone #: ###-#### needs to install fire place
BLD17-02305 BLD-Energy code compliance9/13/20189/14/20189/14/2018 8:18:26 AMAPASS
Roger Phone #: ###-####