ELE19-03499
| Electrical Rough-In | 9/17/2019 | 9/17/2019 | 9/17/2019 2:11:42 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender Ok cover walls and grd work for floor box.
|
ELE19-03399
| Final | 9/17/2019 | 9/17/2019 | 9/17/2019 1:54:03 PM | P | PASS |
|
|
I will call and schedule a time to meet onsite Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok final. 40a on 200a panel, labels present
|
ELE19-03513
| Electrical Rough-In | 9/17/2019 | 9/17/2019 | 9/17/2019 1:34:57 PM | P | PASS |
|
|
Leon Phone #: ###-#### Ok cover whole house.
|
ELE18-01605
| Final | 9/17/2019 | 9/17/2019 | 9/17/2019 1:08:18 PM | P | PASS |
|
|
Stair tower A 1st-4th Trash and Janitor Closet 104 Electrical Room Mechanical room Maintenance Room Stair tower 2 Cage rooms 50 stack
Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed
|
ELE19-02756
| Final | 9/16/2019 | 9/17/2019 | 9/17/2019 12:06:09 PM | P | PASS |
|
|
House is unoccupied. Code is 5200. Lockbox is on fence to the left of front porch. Phone #: ###-#### Inspection requested via web by Chris Husted Ok final.
|
ELE19-03510
| Permanent Service | 9/17/2019 | 9/17/2019 | 9/17/2019 11:58:33 AM | P | PASS |
|
|
Please call when you are in route Phone #: ###-#### Inspection requested via web by Spencer McLean Power for pedistal/verizon cell tower. p/s u/g n ok
|
ELE19-02492
| Final | 9/17/2019 | 9/17/2019 | 9/17/2019 10:31:38 AM | A | PASS |
|
|
I need to run my kids to school at 9am and have a doctor''s appointment at 9:30. If it works before then, great. If not, can we reschedule. Phone #: ###-#### Inspection requested via web by Nick Smith Ok final. 50a brkr changed to 60a for garage, panel labeled.
|
ELE19-02878
| Electrical Rough-In | 9/16/2019 | 9/17/2019 | 9/17/2019 10:20:08 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Donald Sorrells 1. Nail plates 2. Securing within 8" in various locations. 3. Support every 4-1/2 feet on vertical runs.
|
ELE19-01691
| Final | 9/16/2019 | 9/17/2019 | 9/17/2019 9:40:51 AM | A | PASS |
|
|
Key on top of meterbase. Phone #: ###-#### Inspection requested via web by William Andrews Ok final.
|
ELE19-03230
| Electrical Rough-In | 9/16/2019 | 9/17/2019 | 9/17/2019 8:55:08 AM | A | PASS |
|
|
This request is for a RI/Cover inspection please Phone #: ###-#### Inspection requested via web by Darryn Coburn Ok cover back addition. Still knob and tube remaining, but will be removed when existing wall is demoed.
|
ELE19-00365
| Final | 9/16/2019 | 9/17/2019 | 9/17/2019 8:52:51 AM | A | NR |
|
|
Key under the mat by the garage door. If you have any questions please feel free to contact Darren ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Floor heat thermo needs installed. Contractor was waiting on homeowner to finish bath floor tile.
|