Inspections for the day of: Friday, September 2, 2016.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-02353 Final9/1/20169/2/20169/2/2016 2:35:48 PMPNR
Final Inspection End of day preferred.
Contact Damon Barr Phone #: ###-#### Inspection requested via web by Cathy Duchek
not ready breakers were not on site for final
ELE16-02645 Final9/2/20169/2/20169/2/2016 2:16:05 PMPPASS
correction fixed final ok
ELE16-02833 Permanent Service9/1/20169/2/20169/2/2016 2:03:27 PMPPASS
The grounding (rods and H20) are done.
Replacing burned buss Panel and adding slip coupling to IP pvc. Could come by late AM if in area. Call/Text when on your way. Kevin Phone #: ###-#### Inspection requested via web by Kevin Cowgill
p/s u/g rec ok
ELE16-02625 Final9/2/20169/2/20169/2/2016 1:45:28 PMPPASS
Justin Phone #: ###-####
final for sign ok
ELE16-02645 Final9/1/20169/2/20169/2/2016 1:37:51 PMPFAIL
Phone #: ###-#### Inspection requested via web by CHRIS CARMINE
408.4 field identification required
all l.v boxes shall be closed/ mail box was full and could not leave message
ELE16-02413 Final9/2/20169/2/20169/2/2016 1:16:55 PMPFAIL
ready now. code 1234 Phone #: ###-#### Inspection requested via web by Bob Glenn
404.14(e) dimmer switches shall be listed with proper lamp for use with
ESC16-00804 Site Final9/2/20169/2/20169/2/2016 12:53:00 PMPPASS
Site final ok
ELE16-02347 Final9/2/20169/2/20169/2/2016 12:02:04 PMPPASS
ready after 9:00am Phone #: ###-#### Inspection requested via web by Bob Glenn
final ok
ELE16-02320 Final9/2/20169/2/20169/2/2016 11:32:15 AMPPASS
Phone #: ###-#### Inspection requested via web by daniel bibikov
Corrections fixed final ok
ESC16-00839 Site Final9/2/20169/2/20169/2/2016 11:29:28 AMPPASS
Site final ok
ELE15-00495 Electrical Rough-In9/1/20169/2/20169/2/2016 10:57:48 AMAPASS
Ceiling cover inspection. 4th floor GBAD pre function room.
Contact is Mark Gibson ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves
pre-function room ceilings where open j-boxes above grid ok cover(noted on inspection book)
ELE16-02600 Electrical Rough-In9/1/20169/2/20169/2/2016 10:22:48 AMAPASS
Dave. 3rd Floor rough in. Phone #: ###-#### Inspection requested via web by Sean DeLacy
2nd floor bath hard lids only,2nd floor storage wall ok cover
3rd floor 331,330,329,326,322,321,318,317,316 interior walls unit314 hall wall interior only ok cover
ELE16-02872 Electrical Rough-In9/1/20169/2/20169/2/2016 9:13:42 AMAPASS
wire room to code , little dog doesn''t bite ###-#### home owner''s number Phone #: ###-#### Inspection requested via web by Jesse Fuentes
back patio ok cover
ELE16-02872 Electrical Rough-In9/1/20169/2/20169/2/2016 9:13:14 AMAPASS
wire room to code , little dog doesn''t bite ###-#### home owner''s number Phone #: ###-#### Inspection requested via web by Jesse Fuentes
back patio ok cover
ELE16-02823 Final9/1/20169/2/20169/2/2016 8:48:06 AMAPASS
Phone #: ###-#### Inspection requested via web by Randy Fletcher
Final for moving panel ok
ELE16-02320 Final9/2/20169/2/20169/2/2016 8:48:06 AMANR
Phone #: ###-#### Inspection requested via web by daniel bibikov
not ready
ELE13-00158 ELE-Aging Inspection9/2/20169/2/20169/2/2016 7:51:45 AM CANC
too busy
ELE12-01762 ELE-Aging Inspection9/2/20169/2/20169/2/2016 7:51:34 AM CANC
too busy
ELE13-00109 ELE-Aging Inspection9/2/20169/2/20169/2/2016 7:51:18 AM CANC
too busy
ELE13-00163 ELE-Aging Inspection9/2/20169/2/20169/2/2016 7:51:02 AM CANC
too busy
ELE16-02677 Electrical Rough-In9/1/20169/2/20169/1/2016 2:28:21 PMAPASS
Please call 30min ahead for access - Mitch Phone #: ###-####
Kitchen and upstairs ok cover