FIR14-00667
| INSP-Sprinkler Rough-in | 9/23/2014 | 9/24/2014 | 9/24/2014 3:22:42 PM | P | PASS |
|
|
See the city approved plans for locations where the sprinkler piping can be covered by the new hardlids.
|
FIR14-00616
| INSP-Sprinkler Rough-in | 9/24/2014 | 9/24/2014 | 9/24/2014 3:07:41 PM | P | PASS |
|
|
See the city approved plans for locations where piping can be covered by the new hardlids.
|
FIR14-00367
| INSP-Final Inspection | 9/23/2014 | 9/24/2014 | 9/24/2014 2:59:00 PM | A | FAIL |
|
|
Plan need to be resubmitted showing the 2" branchline piping.
|
FIR14-00674
| INSP-Final Inspection | 9/23/2014 | 9/24/2014 | 9/24/2014 2:58:31 PM | A | FAIL |
|
|
Can final when as-builts have been submitted showing the zone change.
|
FIR14-00399
| INSP-Sprinkler Rough-in | 9/24/2014 | 9/24/2014 | 9/24/2014 2:57:53 PM | P | PASS |
|
|
Rough-in passed but piping can not be covered until a tenting inspection has been completed.
|
FIR14-00419
| INSP-Sprinkler Rough-in | 9/24/2014 | 9/24/2014 | 9/24/2014 2:57:07 PM | P | FAIL |
|
|
Tenting is not complete.
|
FIR14-00544
| INSP-Sprinkler Rough-in | 9/23/2014 | 9/24/2014 | 9/24/2014 2:38:56 PM | P | PASS |
|
|
Rough-in passed. Tenting passed. Piping can be covered.
|
FIR14-00544
| INSP-Supply line flush | 9/23/2014 | 9/24/2014 | 9/24/2014 2:36:51 PM | P | PASS |
|
|
The underground flush passed
|
BLD14-01447
| FIRE-Final Inspection | 9/23/2014 | 9/24/2014 | 9/24/2014 10:15:26 AM | A | FAIL |
|
|
The new overbuilds create combustible concealed spaces that need to meet the requirements of NFPA 13 which may include addtion/modification to the existing fire sprinkler system.
|
FIR14-00300
| INSP-Sprinkler Rough-in/Hydro | 9/23/2014 | 9/24/2014 | 9/24/2014 10:09:51 AM | A | PASS |
|
|
Wet system hydro test passed
|
FIR14-00610
| INSP-Sprinkler Rough-in | 9/23/2014 | 9/24/2014 | 9/24/2014 8:53:58 AM | A | PASS |
|
|
Last part of underground ok to cover
|