ELE18-03718 Conference9/28/20189/28/20189/28/2018 4:06:39 PMPDONE
Discussed code requurements, prevdious conference the wrong disp was entered on accident by inspector375
ELE18-02411 Electrical Rough-In9/28/20189/28/20189/28/2018 2:32:22 PMPPASS
1st floor rough-in Building D
Contact Scott Wilson
Thank you. Phone #: ###-#### Inspection requested via web by Tom Betty
1st floor ok to cover
ELE18-02349 Electrical Rough-In9/27/20189/28/20189/28/2018 2:32:00 PMPCANC
Brad Phone #: ###-####
Conference needed
ELE18-02349 Conference9/28/20189/28/20189/28/2018 2:31:55 PMPDONE
Brad Phone #: ###-####
Discussed same items as the previos conference
ELE18-02273 Final9/28/20189/28/20189/28/2018 1:05:49 PMPPASS
Phone #: ###-#### Inspection requested via web by Jason Wicks
Corrections fixed final ok
ELE18-03583 Electrical Rough-In9/27/20189/28/20189/28/2018 12:21:27 PMAPASS
Phone #: ###-#### Inspection requested via web by BRS Permitting
Solar array listing ok
ELE18-03501 Temporary Service9/27/20189/28/20189/28/2018 12:16:01 PMAPASS
Phone #: ###-#### Inspection requested via web by David Nelson
t/s o/h n ok
ELE18-03692 Permanent Service9/27/20189/28/20189/28/2018 12:15:41 PMAPASS
Meter Inspection Call Jack if any questions
Lock box code 1551 Phone #: ###-#### Inspection requested via web by Jack Bernard
p/s u/g rec ok
ELE18-03616 Conference9/27/20189/28/20189/28/2018 12:11:14 PMADONE
Dale Phone #: ###-####
Looked at box layout and is good to continue
ELE18-02036 Permanent Service9/27/20189/28/20189/28/2018 9:41:31 AMAPASS
South 6 units for rough, and service Phone #: ###-#### Inspection requested via web by Kevin Burke
p/s u/g n ok 13 meters needed
ELE18-02036 Electrical Rough-In9/27/20189/28/20189/28/2018 9:40:33 AMAPASS
South 6 units for rough Phone #: ###-#### Inspection requested via web by Kevin Burke
Units 107,108,207,208,307,308 ok to cover
ELE18-03553 Electrical Rough-In9/27/20189/28/20189/28/2018 9:17:06 AMAPASS
Phone #: ###-#### Inspection requested via web by BRS Permitting
Verified U/L listing of Solar array components
ELE18-02618 Final9/27/20189/28/20189/28/2018 8:58:46 AMAPASS
The keys are in the front porch under the top stone Phone #: ###-#### Inspection requested via web by Neal Rumsey
Final ok
ELE18-01727 Final9/27/20189/28/20189/28/2018 8:45:38 AMAFAIL
Aaron Phone #: ###-####
Arc Fault protection for all bedrooms required