BLD18-03969
| BLD-Final | 11/29/2018 | 12/6/2018 | 12/6/2018 3:52:14 PM | P | NR |
|
|
Plans left in meter box Phone #: ###-#### Inspection requested via web by Ashley White ele not done
|
BLD18-04253
| BLD-Framing/Rough-in | 12/6/2018 | 12/6/2018 | 12/6/2018 3:51:30 PM | P | NR |
|
|
Call foreman one hour prior to arrival: Barrry Spencer: ###-#### Phone #: ###-#### Inspection requested via web by Rob Maes ele not done
|
BLD18-00999
| BLD-Framing/Rough-in | 12/5/2018 | 12/6/2018 | 12/6/2018 11:33:41 AM | A | PASS |
|
|
Please call when you get to the site, or headed that way. Thank you, Joel Phone #: ###-#### Inspection requested via web by Joel Hartman framing ok pending trades ok to cover
|
BLD17-03932
| BLD-Framing/Rough-in | 12/5/2018 | 12/6/2018 | 12/6/2018 10:38:04 AM | A | PART |
|
|
Michael Phone #: ###-#### bearing valleys/ rafters min 3/4 / fire blk ceilling at chase/ ok to start insulation.
|
BLD18-02067
| BLD-Framing/Rough-in | 12/5/2018 | 12/6/2018 | 12/6/2018 9:15:23 AM | A | PART |
|
|
Jeff Phone #: ###-#### parepet and wall framing ok to cover/ straps and drag struts in place for reroof/ ft ok to cover with floor framing at exterior columns.// stair and ft interior pending aproval and ft placement .
|
BLD18-01645
| BLD-Final | 12/5/2018 | 12/6/2018 | 12/6/2018 12:00:00 AM | P | CANC |
|
|
David Phone #: ###-####
|