BLD18-02751
| BLD-Final | 12/6/2018 | 12/7/2018 | 12/7/2018 3:29:40 PM | P | NR |
|
|
Tim Phone #: ###-####
|
BLD18-02699
| BLD-Ceiling Grid Inspection | 12/6/2018 | 12/7/2018 | 12/7/2018 3:28:44 PM | P | PASS |
|
|
Scott Phone #: ###-#### east stair ok
|
BLD17-04628
| BLD-Wall Bracing | 12/7/2018 | 12/7/2018 | 12/7/2018 3:28:09 PM | P | PASS |
|
|
sheer walls 1st floor
|
BLD17-04624
| BLD-Framing/Rough-in | 12/6/2018 | 12/7/2018 | 12/7/2018 3:16:12 PM | P | PASS |
|
|
Bld B - interior framing and fire caulking Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD17-04626
| BLD-Wall cover | 12/6/2018 | 12/7/2018 | 12/7/2018 3:15:37 PM | P | NR |
|
|
Bld D - drop ceilings for cover. 1st and 2nd floors. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD17-04625
| BLD-Energy code compliance | 12/6/2018 | 12/7/2018 | 12/7/2018 3:15:18 PM | P | PASS |
|
|
Bld C - south 12. B-Units and D-Units. all three floors. insulation for cover. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD18-04395
| BLD-Final | 12/6/2018 | 12/7/2018 | 12/7/2018 2:03:01 PM | P | PASS |
|
|
Sarah or Danielle Phone #: ###-####
|
BLD18-01645
| BLD-Final | 12/7/2018 | 12/7/2018 | 12/7/2018 1:51:54 PM | P | PASS |
|
|
Dave Phone #: ###-####
|
BLD18-01645
| DOC - Permit Finaled | 12/7/2018 | 12/7/2018 | 12/7/2018 1:51:40 PM | P | PASS |
|
|
|
BLD18-01645
| BLD-Blower Door Test Results | 12/7/2018 | 12/7/2018 | 12/7/2018 1:51:24 PM | P | DONE |
|
|
Dave Phone #: ###-#### 4.0
|
BLD17-03932
| BLD-Framing/Rough-in | 12/6/2018 | 12/7/2018 | 12/7/2018 11:47:18 AM | A | PASS |
|
|
Michael Phone #: ###-####
|
BLD18-03241
| BLD-Energy code compliance | 12/6/2018 | 12/7/2018 | 12/7/2018 11:23:57 AM | A | PASS |
|
|
adam Phone #: ###-####
|
BLD18-02990
| BLD-Final | 12/3/2018 | 12/7/2018 | 12/7/2018 11:08:25 AM | A | PASS |
|
|
Brandon Phone #: ###-####
|
BLD18-02990
| DOC - Permit Finaled | 12/7/2018 | 12/7/2018 | 12/7/2018 11:08:07 AM | P | PASS |
|
|
|
BLD18-02298
| BLD-Ceiling Grid Inspection | 12/6/2018 | 12/7/2018 | 12/7/2018 9:58:13 AM | A | PART |
|
|
t bar // Steve Phone #: ###-#### ceilling grid ok pending trade aprovals need resolve with wood above ceilling not fire treated type of const/and return air pienum.
|
BLD18-02996
| BLD-Final | 12/6/2018 | 12/7/2018 | 12/7/2018 9:33:43 AM | A | PART |
|
|
Chris Phone #: ###-#### tco ok pending fire hyd instal on other permited job at paint booth.
|