Inspections for the day of: Wednesday, April 17, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02570 BLD-Framing/Rough-in4/17/20194/17/20194/17/2019 3:04:46 PMPPART
Jon Phone #: ###-#### struc. floor south mez ok to deck/ si reports pending.
BLD18-04210 BLD-Final4/17/20194/17/20194/17/2019 2:18:51 PMPFAIL
Tom Phone #: ###-#### need fire final
BLD19-00880 BLD-Foundation4/17/20194/17/20194/17/2019 2:02:19 PMPPASS
Jerry Phone #: ###-####
BLD19-00942 BLD-Final4/17/20194/17/20194/17/2019 1:55:26 PMPPASS
Phone #: ###-#### Inspection requested via web by David Dexter
BLD19-00942 DOC - Permit Finaled4/17/20194/17/20194/17/2019 1:55:15 PMPPASS
BLD18-02398 BLD-Final4/16/20194/17/20194/17/2019 11:55:55 AMAPASS
Blower door test complete and on site, handrail installed. Call for access. Phone #: ###-#### Inspection requested via web by Josh Peppersack
BLD18-02398 DOC - Permit Finaled4/17/20194/17/20194/17/2019 11:53:44 AMPPASS
BLD18-02398 BLD-Blower Door Test Results4/17/20194/17/20194/17/2019 11:53:30 AMPDONE
Blower door test complete and on site, handrail installed. Call for access. Phone #: ###-#### Inspection requested via web by Josh Peppersack 3.85
BLD18-04079 BLD-Framing/Rough-in4/16/20194/17/20194/17/2019 11:33:33 AMAPASS
The Framer ask if you could call him before hand. He would like to be there to solve any problems.
Stevie Alters ###-####

Thank you
Phone #: ###-#### Inspection requested via web by Scott Asin
BLD19-00716 BLD-Footing4/16/20194/17/20194/17/2019 11:08:46 AMAPART
jose Phone #: ###-#### set backs ok// garage ft pending placement with slab.
BLD17-02185 BLD-Final4/16/20194/17/20194/17/2019 10:49:51 AMANR
Entry ramp at 8th street complete and ready for inspection. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
BLD18-01250 BLD-Final4/16/20194/17/20194/17/2019 10:49:38 AMANR
SI report emailed on 1/24/19. Request permit to be finaled. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
BLD17-01549 BLD-Ceiling Grid Inspection4/17/20194/17/20194/17/2019 9:22:12 AMAPASS
Please call when at the gate Phone #: ###-#### Inspection requested via web by Harvey VanderVeen