BLD18-02800
| BLD-Other | 8/17/2018 | 8/17/2018 | 8/17/2018 2:54:58 PM | P | PASS |
|
|
block and tie-ashley Phone #: ###-####
|
BLD18-01312
| BLD-Framing/Rough-in | 8/16/2018 | 8/17/2018 | 8/17/2018 1:13:10 PM | A | PASS |
|
|
Steve Phone #: ###-####
|
BLD18-02309
| BLD-Framing/Rough-in | 8/15/2018 | 8/17/2018 | 8/17/2018 1:12:55 PM | A | PASS |
|
|
please call to unlock for access Phone #: ###-#### Inspection requested via web by Nate Steffler repair 1hr ceilling/ walls ok
|
BLD18-01064
| BLD-Framing/Rough-in | 8/16/2018 | 8/17/2018 | 8/17/2018 12:16:50 PM | A | NR |
|
|
3rd floor framing area C // Dave Perkins Phone #: ###-#### c/n isued// provide listingforhead of wall assembly and material used.//s/fd instaled 1/2 in 1/2 out of wall assemblies provide listing./provide core board wall/shaft listing for aplacation at door jambs/ bar joist membrane penatrations.// provide fire stopping listings and products from all trades for all penatrations.
|
BLD18-00157
| BLD-Framing/Rough-in | 8/17/2018 | 8/17/2018 | 8/17/2018 12:11:31 PM | P | PASS |
|
|
c/n 6/22 all idems made ok
|
BLD18-02212
| BLD-Final | 8/16/2018 | 8/17/2018 | 8/17/2018 10:17:28 AM | A | PASS |
|
|
Final Phone #: ###-#### Inspection requested via web by Joshua Adams
|
BLD18-02212
| DOC - Permit Finaled | 8/17/2018 | 8/17/2018 | 8/17/2018 10:15:23 AM | P | PASS |
|
|
|
BLD18-01593
| BLD-Footing | 8/16/2018 | 8/17/2018 | 8/17/2018 9:57:05 AM | A | PART |
|
|
concrete at noon // Dave Perkins Phone #: ###-#### placed with si/ ppending reports
|