BLD19-00354
| BLD-Wall Bracing | 3/13/2019 | 3/13/2019 | 3/13/2019 3:45:45 PM | P | PASS |
|
|
Norman Phone #: ###-####
|
BLD18-02630
| BLD-Final | 3/13/2019 | 3/13/2019 | 3/13/2019 3:45:20 PM | P | PASS |
|
|
Michael with KMM-says work is done can''t get a hold of Id Tow Cnst needs final Phone #: ###-####
|
BLD18-02630
| DOC - Permit Finaled | 3/13/2019 | 3/13/2019 | 3/13/2019 3:44:55 PM | P | PASS |
|
|
|
BLD19-00650
| BLD-Final | 3/12/2019 | 3/13/2019 | 3/13/2019 3:34:36 PM | A | PASS |
|
|
Inspection requested via web by Hans Weikl
|
BLD19-00650
| DOC - Permit Finaled | 3/13/2019 | 3/13/2019 | 3/13/2019 3:34:24 PM | P | PASS |
|
|
|
BLD17-04149
| BLD-Conference | 3/13/2019 | 3/13/2019 | 3/13/2019 2:10:50 PM | P | DONE |
|
|
WIP
|
BLD19-00319
| BLD-Conference | 3/12/2019 | 3/13/2019 | 3/13/2019 2:09:59 PM | P | PART |
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Footing inspection. Ground and Rebar ....OK. No stringlines pulled at property lines. unable to verify setbacks. Pour at own risk.
|
BLD18-03665
| BLD-Framing/Rough-in | 3/13/2019 | 3/13/2019 | 3/13/2019 1:55:24 PM | P | PASS |
|
|
Les Phone #: ###-#### Met Les for frame. Verbal....girder truss point loads......fireblock concealed space. Les marked....Red paint. OK to insulate.
|
BLD19-00725
| BLD-Final | 3/12/2019 | 3/13/2019 | 3/13/2019 11:34:08 AM | A | PASS |
|
|
Carl Phone #: ###-#### OK for Perm. Occ.
|
BLD19-00337
| BLD-Footing | 3/12/2019 | 3/13/2019 | 3/13/2019 11:09:33 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Cassandra Hessing Whitnessed Placement....9 piers. appears OK. Need letter of approval from special inspection agency for final.
|
BLD17-00578
| BLD - Request for Extension | 3/12/2019 | 3/13/2019 | 3/13/2019 10:05:19 AM | A | PASS |
|
|
Scott Phone #: ###-#### WIP.
|