Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02098 BLD-Final7/19/20187/20/20187/20/2018 11:31:45 PMPPASS
Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD18-02098 DOC - Permit Finaled7/20/20187/20/20187/20/2018 11:31:32 PMPPASS
BLD17-01855 BLD-Ceiling Grid Inspection7/20/20187/20/20187/20/2018 11:31:10 PMPPASS
Call half before // Dan Phone #: ###-####
Should have been a Final FINAL PASS
BLD17-01855 DOC - Permit Finaled7/20/20187/20/20187/20/2018 11:30:17 PMPPASS
BLD18-01856 BLD-Wall Bracing7/20/20187/20/20187/20/2018 11:29:51 PMPPASS
Christian--would like mid afternoon Phone #: ###-####
BLD18-01975 BLD-Final7/20/20187/20/20187/20/2018 11:29:25 PMPNR
mid-late afternoon, after Fire/Life - Bob Phone #: ###-####
Need Fire Final
BLD17-02704 BLD-Framing/Rough-in7/20/20187/20/20187/20/2018 11:29:24 PMPPART
Mark Phone #: ###-####
South 2/3 of bldg....OK
BLD18-01332 BLD-Framing/Rough-in7/19/20187/20/20187/20/2018 2:04:38 PMPPART
Steve Phone #: ###-####
Framing on Cooler....OK to cover
BLD18-02301 BLD-Final7/19/20187/20/20187/20/2018 12:37:37 PMAPASS
Kevin Phone #: ###-####
BLD18-02301 DOC - Permit Finaled7/20/20187/20/20187/20/2018 12:37:25 PMPPASS
BLD18-02417 BLD-Framing/Rough-in7/20/20187/20/20187/20/2018 12:23:12 PMPPART
beam inreplace of bearing wall // Paul or Karen or ###-#### (cell) Phone #: ###-####
Beam above ceiling......OK.
BLD18-01190 BLD-Concrete7/20/20187/20/20187/20/2018 11:53:33 AMAPART
Gym slab rebar and vapor barrier inspection request. The slab is scheduled to place next Monday. PM inspection is fine as well the area ready at any time. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
Slab OK pending MTI special inspection, tests and approvals.
BLD18-02180 BLD-Framing/Rough-in7/17/20187/20/20187/20/2018 11:06:35 AMAPASS
Tim Phone #: ###-####
BLD18-02283 BLD-Framing/Rough-in7/17/20187/20/20187/20/2018 10:11:36 AMAPASS
Thomas Phone #: ###-####
Frame and Energy OK........Pending Electr, Plumb. and Mech rough in approvals.
BLD18-01711 BLD-Footing7/19/20187/20/20187/20/2018 9:36:07 AMAPASS
Matt Phone #: ###-####
BLD18-01516 BLD-Energy code compliance7/19/20187/20/20187/20/2018 9:20:36 AMAPASS
Brian Phone #: ###-####
BLD17-02919 DOC - Permit Finaled7/20/20187/20/20187/20/2018 7:49:47 AMPPASS
BLD18-02576 DOC - Permit Finaled7/20/20187/20/20187/20/2018 7:48:17 AMPPASS