ELE19-00106
| Electrical Rough-In | 1/9/2019 | 1/10/2019 | 1/10/2019 2:57:37 PM | P | PASS |
|
|
Please contact Brian w/any questions or comments
Thank you ; have a nice day! Phone #: ###-#### Inspection requested via web by JENNY EMEL Wall rough in ok cover
|
ELE19-00038
| Electrical Rough-In | 1/9/2019 | 1/10/2019 | 1/10/2019 2:32:35 PM | P | FAIL |
|
|
Elec ri. Zach on site. Phone #: ###-#### Inspection requested via web by Garrett Collins 210.52- A receptacle outlet shall be installed with in 6' of pocket door in master bedroom. 300.4- Where NM cable is run thru bored holes that do not maintain 1 1/4" from framing surface they shall be protected from damage by nail plates in kitchen near sink. 314.17(C)- Where knob and tube wiring enter a non-metallic box the conductors shall enter thru individual holes. Kitchen ceiling near door. 334.30- NM calbe shall be secured in place with in 12" of a box. NM cable passes thru hole in beam and enters recessed can with out being secured in place. House is unoccupied
|
ELE19-00102
| Final | 1/9/2019 | 1/10/2019 | 1/10/2019 12:13:20 PM | A | PASS |
|
|
Garage code 6975 to access job Phone #: ###-#### Inspection requested via web by Same Electric Final ok
|
ELE19-00102
| Electrical Rough-In | 1/10/2019 | 1/10/2019 | 1/10/2019 11:35:21 AM | P | PASS |
|
|
Garage code 6975 to access job Phone #: ###-#### Inspection requested via web by Same Electric Tesla charger, listing confirmed, rough in ok
|
ELE18-03640
| Final | 1/9/2019 | 1/10/2019 | 1/10/2019 11:18:28 AM | A | PASS |
|
|
garage code 1524 Phone #: ###-#### Inspection requested via web by Darryn Coburn Final ok
|
ELE18-03320
| Electrical Rough-In | 1/9/2019 | 1/10/2019 | 1/10/2019 11:01:42 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 590.6(A)(2)- Trim out temp power part of building power GFCI protection shall be provided during construction. Few plug in GFCI being used, most are not using. Level 4 grid rough in ok cover. OK for furniture.
|
ELE19-00020
| Final | 1/9/2019 | 1/10/2019 | 1/10/2019 10:27:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark M Final ok
|
ELE18-02369
| Conference | 1/10/2019 | 1/10/2019 | 1/10/2019 9:35:29 AM | P | PASS |
|
|
Discussed with Ben temporary power requirements for job site. Having issues with tripping circuit taking out multiple floors. As long as temporary power complies with 590.6(B)(1)(2)(3) ok to make changes to reduce tripping issues.
|