ELE20-00111
| Rough-In Permanent Service | 1/10/2020 | 1/10/2020 | 1/10/2020 3:11:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Same Electric Service change only. p/s o/h rec ok
|
ELE19-04615
| Final | 1/10/2020 | 1/10/2020 | 1/10/2020 2:28:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Burke Corridor clean up good. Thank you. Final ok
|
ELE19-04895
| Final | 1/10/2020 | 1/10/2020 | 1/10/2020 1:39:48 PM | P | PASS |
|
|
upstairs bathroom Phone #: ###-#### Inspection requested via web by Ryan Wake Final ok
|
ELE19-04060
| Final | 1/9/2020 | 1/10/2020 | 1/10/2020 12:22:10 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Final ok
|
ELE19-04061
| Final | 1/9/2020 | 1/10/2020 | 1/10/2020 12:21:44 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Final ok
|
ELE19-04159
| Final | 1/9/2020 | 1/10/2020 | 1/10/2020 12:21:23 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Final ok
|
ELE19-04160
| Final | 1/9/2020 | 1/10/2020 | 1/10/2020 12:20:58 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson 110.3- Devices shall be wired as per manufacturers instructions. back outdoor receptacles cold. Unable to test.
|
ELE19-04799
| Electrical Rough-In | 1/9/2020 | 1/10/2020 | 1/10/2020 11:31:09 AM | A | PASS |
|
|
UFER ground at footing north of MSB1 Phone #: ###-#### Inspection requested via web by Jason Parke Concrete encased electrode, footing sleeves, service entrance conduits up column rough in ok cover.
|
ELE19-04582
| Final | 1/9/2020 | 1/10/2020 | 1/10/2020 10:27:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brad Hoots Final ok
|
ELE19-02808
| Electrical Rough-In | 1/9/2020 | 1/10/2020 | 1/10/2020 10:27:21 AM | A | PASS |
|
|
walls/ceilings in storefront for cover Phone #: ###-#### Inspection requested via web by Mike McCarrel 110.26- Access shall be provided for all electrical equipment. HVAC unit buried above hardlid. 110.26(A) and (A)(4)(c)- Work space shall be provided for HVAC electrical enclosure and door of enclosure shall open to at least 90 degrees. Copper plumbing lines run in front of door blocking work space and door operation. Must be corrected for grid inspections. Tasting reception area outer walls and ceiling not ready. Back wall of tasting reception area and vestibule walls and ceiling rough in ok cover.
|
ELE19-03933
| Final | 1/9/2020 | 1/10/2020 | 1/10/2020 8:53:19 AM | A | PASS |
|
|
Install 1 wall signs reading Idaho Power. All Primary power by others Phone #: ###-#### Inspection requested via web by Ken Olsen Final ok
|