ELE16-02665
| Final | 11/1/2016 | 11/2/2016 | 11/2/2016 2:19:24 PM | P | FAIL |
|
|
Please contact Dave ###-#### Unit 3-401 Phone #: ###-#### Inspection requested via web by Emmet Bushman 110.25- Lockouts acceptable for appliances fixed in place where disconnecting means not with in sight. Oven, micro. 348.30- Furnace flex shall be secured and supported so not subject to physical damage. 12" of termination, 4 1/2' between. 410.16- Recessed cans in her closet shall have totally enclosed lamps.
|
ELE16-03517
| Temporary Service | 11/2/2016 | 11/2/2016 | 11/2/2016 1:13:37 PM | P | PASS |
|
|
Ron Phone #: ###-#### t/s o/h n ok
|
ELE16-02674
| Rough-In Permanent Service | 11/1/2016 | 11/2/2016 | 11/2/2016 11:08:38 AM | A | CANC |
|
|
Site Contact is Jerrod. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Needed rough in of step down transformer and sub-feeds to panels.
|
ELE16-02674
| Electrical Rough-In | 11/2/2016 | 11/2/2016 | 11/2/2016 11:08:15 AM | P | PASS |
|
|
Site Contact is Jerrod. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Assigned to BLD16-01929 Installation of step down transformer and sub-feeds to panels rough in ok.
|
ELE15-02018
| Final | 10/31/2016 | 11/2/2016 | 11/2/2016 10:36:44 AM | A | PASS |
|
|
Matt Phone #: ###-#### Called Dave to see if he requested final he stated ok. Service only final ok
|
ELE13-02945
| Final | 10/31/2016 | 11/2/2016 | 11/2/2016 10:33:02 AM | A | FAIL |
|
|
Matt Phone #: ###-#### 210.8- If basement remains unfinished all receptacle outlets shall be GFCI protected. 210.11- Bathroom receptacle outlets shall be on a dedicated 20 amp that shall serve no others. Laundry circuit shall be 20 amp dedicated and shall serve no others. Kitchen circuits shall only serve kitchen areas. 210.12- All outlets in bedroom areas shall have AFCI protection. Dn bed, smokes. 300.4- Where MN cable enters junction boxes on cans abrasion protection needed. 314.17- NM cable sheath shall enter box at least 1/4" before removed. 334.30- NM cable shall be secured with in 12" of boxes, cans and smokes. basement.
|
ELE15-03901
| Final | 11/1/2016 | 11/2/2016 | 11/2/2016 9:39:13 AM | A | PASS |
|
|
Call Pierce for final of Clearwater TI floors 4-9. Phone #: ###-#### Inspection requested via web by Rafael Castillo Signed off on floors 4 thru 9 of clearwater paperwork. 4th floor page showed different BLD but labelled clearwater. Final ok
|