ELE18-02853
| Electrical Rough-In | 1/31/2019 | 2/1/2019 | 2/1/2019 2:02:56 PM | P | PASS |
|
|
Building E Rough in for Cover in the breezeways and Units 100, 101, 102, 103, 200, 201, 202, 203, 300, 301, 302, 303 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as noted and both breezeways rough in ok cover
|
ELE18-02687
| Electrical Rough-In | 1/31/2019 | 2/1/2019 | 2/1/2019 1:59:35 PM | P | PASS |
|
|
Building B Rough in for the drop ceilings in Units 100, 101, 103 (102 can’t be done because of a change in the unit), Units 200, 201, 202, 203, 300, 301, 302, 303 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted drop lids rough in ok cover
|
ELE19-00405
| Permanent Service | 1/31/2019 | 2/1/2019 | 2/1/2019 11:44:18 AM | A | PASS |
|
|
New permanent service. Phone #: ###-#### Inspection requested via web by Kevin Perez Contractor to check on underground water pipe if accessible will use with ground rods for GES. p/s o/h rec ok
|
ELE19-00177
| Electrical Rough-In | 2/1/2019 | 2/1/2019 | 2/1/2019 11:24:25 AM | A | PASS |
|
|
Karl Miller is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Small walls added thru out entire floor, check print. Rough in ok cover
|
ELE19-00373
| Electrical Rough-In | 1/31/2019 | 2/1/2019 | 2/1/2019 10:44:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by SHAWN TOMLINSON Discussed with general contractor existing knob and tube must remain in free air. Up master bathroom rough in ok cover
|
ELE18-04548
| Final | 1/31/2019 | 2/1/2019 | 2/1/2019 10:22:40 AM | A | PASS |
|
|
For access please call Jaman 1/2 hr prior to inspection. 208 - ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Final ok
|
ELE18-01935
| Electrical Rough-In | 1/31/2019 | 2/1/2019 | 2/1/2019 10:04:52 AM | A | PASS |
|
|
Units 206 , 207 , 209 Phone #: ###-#### Inspection requested via web by Tom Betty Rooms as noted rough in ok cover
|