ELE20-00851
| Final | 3/11/2020 | 3/12/2020 | 3/12/2020 3:27:16 PM | P | PASS |
|
|
Inspect some added Outlets Phone #: ###-#### Inspection requested via web by Patrick Clark Final ok
|
ELE20-00851
| Electrical Rough-In | 3/12/2020 | 3/12/2020 | 3/12/2020 3:26:50 PM | P | PASS |
|
|
Inspect some added Outlets Phone #: ###-#### Inspection requested via web by Patrick Clark All wiring fished in. Rough in ok
|
ELE20-00875
| Electrical Rough-In | 3/12/2020 | 3/12/2020 | 3/12/2020 2:21:25 PM | P | PASS |
|
|
Please enter trough back door that will be unlocked. Thank you. Phone #: ###-#### Inspection requested via web by Nermin Bobaric Kitchen sink wall rewired receptacles for an unchanged layout, adjacent wall new appliances, and cabinet layout. Kitchen remodel rough in ok cover.
|
ELE19-04799
| Electrical Rough-In | 3/11/2020 | 3/12/2020 | 3/12/2020 1:31:47 PM | P | PASS |
|
|
Elevated concrete deck rough in Area over alley Phone #: ###-#### Inspection requested via web by Jason Parke GFCI protection provided for temp power skid located level 2. Discussed allowing general contractor to close a portion of level 4 while wiring on upper levels not complete. As an electrical inspector I am not able to grant general contractor ok to cover any areas where wiring not complete and without the request of electrical contractor permitted to complete scope of work. Area noted pour rough in ok cover.
|
ELE20-00320
| Rough-In Permanent Service | 3/12/2020 | 3/12/2020 | 3/12/2020 11:17:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Schroder Rough in ok cover p/s u/g n ok
|
ELE20-00872
| Electrical Rough-In | 3/11/2020 | 3/12/2020 | 3/12/2020 10:36:24 AM | A | PASS |
|
|
Please call Kengei for access at ###-#### Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Kitchen remodel with no new walls just new cabinet layout and appliances rough in ok cover.
|
ELE19-00601
| Electrical Rough-In | 3/11/2020 | 3/12/2020 | 3/12/2020 9:58:50 AM | A | PASS |
|
|
Corridor cover for floors 3-5. Tyson is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Areas noted rough in ok cover
|
ELE19-02808
| Electrical Rough-In | 3/11/2020 | 3/12/2020 | 3/12/2020 9:24:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Adequate access shall be provided for an in duct heater in walkway ceiling above hardlid. Grid for tasting bar and panel corridor rough in ok cover
|