ELE16-02769
| ELE-Aging Inspection | 3/15/2019 | 3/15/2019 | 3/15/2019 3:06:18 PM | | FAIL |
|
|
Called contractor who complete rewiring of branch circuits and approached building owner to discuss the need to change panel out because AFCI protective devices are not available for the brand of panel that exists. Will address issue with supervisor next week and call to inform next step. Scheduled aging inspection request for Monday.
|
ELE18-03224
| Electrical Rough-In | 3/15/2019 | 3/15/2019 | 3/15/2019 2:44:55 PM | P | PASS |
|
|
Contact: Wes Powell - wall rough in please Phone #: ###-#### Inspection requested via web by Deb Gooden All rooms accessible from gym, 2 storage, 2 bathrooms, IT room, wall rough in ok cover
|
ELE19-00901
| Electrical Rough-In | 3/15/2019 | 3/15/2019 | 3/15/2019 2:16:25 PM | P | PASS |
|
|
customer phone # ###-#### Phone #: ###-#### Inspection requested via web by Matthew White Kitchen remodel rough in ok cover.
|
ELE19-00659
| Electrical Rough-In | 3/15/2019 | 3/15/2019 | 3/15/2019 1:38:02 PM | P | PASS |
|
|
CONTACT: CALEB BURKE. Ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Call ahead code required for elevator. Upper vaulted ceiling grid rough in ok cover
|
ELE18-04138
| Electrical Rough-In | 3/14/2019 | 3/15/2019 | 3/15/2019 11:59:39 AM | A | PART |
|
|
Ceiling inspection for Mixed Aviary building Phone #: ###-#### Inspection requested via web by Mike McCarrel Ok to spray foam lid, additional wiring needed for ceiling after insulated.
|
ELE18-01935
| Electrical Rough-In | 3/14/2019 | 3/15/2019 | 3/15/2019 11:17:33 AM | A | PASS |
|
|
Unit 406 and drop ceilings units 211 , 212 , 213 , 214 and 215. Call John
Phone #: ###-#### Inspection requested via web by Tom Betty 406 and hardlids noted rough in ok cover
|
ELE19-00596
| Electrical Rough-In | 3/14/2019 | 3/15/2019 | 3/15/2019 11:16:44 AM | A | PART |
|
|
Contact: Mike Ennis - wall rough-in please Phone #: ###-#### Inspection requested via web by Deb Gooden Issue with demizing wall fire rating with panel located recessed in it. Suggested surface mounting in end of hall way as possible solution. Rough in ok cover offices and 1 side of demizing wall up to end where panel located.
|
ELE19-00898
| Electrical Rough-In | 3/14/2019 | 3/15/2019 | 3/15/2019 9:44:57 AM | A | FAIL |
|
|
Key for unit in northwest corner is in J E Suttons office. Need ok to Sheetrock new wall and put grid back in rooms with new cans call with any questions thanks! Phone #: ###-#### Inspection requested via web by Trevor Soesbe Unit accually 100. 110.3- Recessed can covers shall be installed as per manufacturers instructions. 314.17(A)- Unused openings shall be closed by approved means. BCC 4 05 32- no code violation to be retained. As noted on building permit, support or remove all electrical. 300.11- Raceways and cables shall not be supported by grid. 314.23- Electrical boxes shall be secured to structure. 314.25- All boxes shall have covers installed. 348.30- FMC shall be supported at intervals ot to exceed 4 1/2' and be secured with in 12" of a box. 358.30- EMT shall shall be supported at intervals not to exceed 10' and secured with in 3' of a box.
|