ELE20-00945
| Rough-In Permanent Service | 3/25/2020 | 3/25/2020 | 3/25/2020 4:06:37 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown Rough in ok cover p/s u/g n ok
|
ELE20-01069
| Electrical Rough-In | 3/24/2020 | 3/25/2020 | 3/25/2020 3:17:39 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton ' Wall rough in ok cover
|
ELE20-00123
| Electrical Rough-In | 3/24/2020 | 3/25/2020 | 3/25/2020 2:53:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Grid on perimeter and focus, conference rooms.
|
ELE19-03641
| Final | 3/18/2020 | 3/25/2020 | 3/25/2020 11:13:48 AM | A | CANC |
|
|
on site contact is Jay Thompson @ ###-####. Phone #: ###-#### Inspection requested via web by Jim Noll Spoke with Jim who stated he would reschedule in future when safe to do so.
|
ELE20-01065
| Final | 3/24/2020 | 3/25/2020 | 3/25/2020 11:12:48 AM | A | FAIL |
|
|
Final inspection please. Stay safe. Have a bless week! Phone #: ###-#### Inspection requested via web by Kyle Lott Went to space noted, individual stated no work has been done since moving in in January. Recall with specific notes as to which outlets added and where.
|
ELE20-01005
| Electrical Rough-In | 3/24/2020 | 3/25/2020 | 3/25/2020 11:10:56 AM | A | FAIL |
|
|
Rough in please. Thank you. Have a bless day! Phone #: ###-#### Inspection requested via web by Kyle Lott Not much info on scope of work, found lights on entry ramp which appear new. Unable to verify listing. Provide listing and complete scope of work.
|
ELE19-03884
| Final | 3/24/2020 | 3/25/2020 | 3/25/2020 10:31:58 AM | A | FAIL |
|
|
Final inspection please. Thank you. Have a bless day! Phone #: ###-#### Inspection requested via web by Kyle Lott 110.12(A)- Unused openings shall be closed by approved means. KOs in bell boxes in ceiling. 225.32- Seperate structures shall have a disconnecting means. 342.30- IMC shall be secured with in 3' of emerging from grade. BCC 4-05-23- Underground to bike structure did not have an inspection.
|
ELE20-01047
| Temporary Service | 3/23/2020 | 3/25/2020 | 3/25/2020 10:10:52 AM | A | CANC |
|
|
Added a sub panel for power on 2-spider box cords Phone #: ###-#### Inspection requested via web by BRAD BAKER Walked for rear in alley, worker informed me asbestos being removed. Visible cloud of dust in alley. Due to health dangers I will not enter with visible dust around, recall when done with asbestos removal.
|
ELE19-04502
| Electrical Rough-In | 3/25/2020 | 3/25/2020 | 3/25/2020 9:13:55 AM | A | PASS |
|
|
Piping for L2 PT deck Phone #: ###-#### Inspection requested via web by Tom Betty A set of stamped city approved set of prints on site, confirmed. Conference for in floor boxes along rails located on level 2 of live works units, west wall, ok to be slightly over 6' from start of wall to receptacle as required by 210.52(A). Structural cables and rebar require a minimum clearance of non stuctural components. Area noted level 2 PT deck pour rough in ok cover.
|
ELE20-00974
| Permanent Service | 3/23/2020 | 3/25/2020 | 3/25/2020 12:00:00 AM | P | CANC |
|
|
cancel per owner 3-24-2020 Ron Phone #: ###-####
|