ELE20-01507
| Final | 5/1/2020 | 5/1/2020 | 5/1/2020 11:30:23 AM | P | PASS |
|
|
Please call Garrett at ###-#### 1/2 hour prior to arrival. Thank you! Phone #: ###-#### Inspection requested via web by Lynn Proctor Rough in completed under ELE20-00408. Final ok
|
ELE20-00408
| Final | 4/30/2020 | 5/1/2020 | 5/1/2020 11:27:39 AM | A | PASS |
|
|
Please contact Garrett at ###-#### 1/2 hour prior to being there for the inspection. Phone #: ###-#### Inspection requested via web by Lynn Proctor Final ok
|
ELE20-01255
| Rough-In Permanent Service | 4/30/2020 | 5/1/2020 | 5/1/2020 10:39:59 AM | A | FAIL |
|
|
It is open. If you have any questions please feel free to contact Chaz ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan 110.3- As per manufacturers instructions, 80 to 125 amp breakers shall be installed at lowest position on bus bar, space 125 amp breaker is installed is rated at 50 amp max. On main level living room recessed can cover shall be completely installed. 210,52(A)- A receptacle outlet shall be located with in 6' of basement bathroom door. 250.32(A)- A grounding electrode system shall be installed at seperate structures, house.
|
ELE20-01461
| Temporary Service | 4/30/2020 | 5/1/2020 | 5/1/2020 9:25:37 AM | A | PASS |
|
|
Jeff is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Located around south end by southwest portable classroom. t/s u/g n ok
|