Inspections for the day of: Monday, May 13, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE15-00102 ELE-Aging Inspection5/13/20195/13/20195/17/2019 2:52:01 PM FAIL
Waiting on contractor
ELE19-01200 Electrical Rough-In5/10/20195/13/20195/13/2019 3:30:55 PMPPASS
Ceiling Grid Inspection Phone #: ###-#### Inspection requested via web by Bryan Atkins
Boarders installed prior to inspection, not allowed. 3 small rooms grid rough in ok cover
ELE18-00602 Electrical Rough-In5/13/20195/13/20195/13/2019 3:02:14 PMPNH
John-ceiling Phone #: ###-####
Called, no answer, left message, recall when accessible.
ELE18-01935 Electrical Rough-In5/13/20195/13/20195/13/2019 2:34:38 PMPPASS
5TH floor units ceiling drops.
Unit 515/513/511/514/512 fire place
Pent house trash room
3rd floor corridor lights
Contact John (Homey) McElroy
Thank you,
Phone #: ###-#### Inspection requested via web by Cathy Duchek
Level 3 corridor drop lids, level 5 units 511, 512, 513, 514, 515, fire place in 512 and penthouse trash room rough in ok cover
ELE19-00659 Final5/13/20195/13/20195/13/2019 1:59:18 PMPPASS
Contact: Caleb Burke.. Please call before going Phone #: ###-#### Inspection requested via web by Deb Gooden Final ok
ELE16-00661 ELE-Aging Inspection5/13/20195/13/20195/13/2019 12:50:37 PM PASS
Drove by and inspected
ELE16-00661 Electrical Rough-In5/13/20195/13/20195/13/2019 12:50:08 PMPPASS
Listing and disconnecting means confirmed. Rough in ok.
ELE16-00661 Final5/13/20195/13/20195/13/2019 12:49:11 PMPPASS
Final ok
ELE19-00155 Final5/10/20195/13/20195/13/2019 12:23:11 PMAPASS
Phone #: ###-#### Inspection requested via web by A.M.E. Office Final ok
ELE18-02369 Conference5/10/20195/13/20195/13/2019 10:05:24 AMADONE
Request for consultation to meet requirements for building temporary occupancy. Phone #: ###-#### Inspection requested via web by Scott Campbell
Discussed requirements for TCO of core and shell. All emergency lighting, interior and exterior egress lighting, gererator shall be operational and commissioning reports complete. All unfinished wiring shall terminate in a box.
ELE18-02369 Electrical Rough-In5/10/20195/13/20195/13/2019 10:01:36 AMAPASS
3rd and 4th Floor Ceiling Inspection for cover. Phone #: ###-#### Inspection requested via web by Scott Campbell
Levels 3 and 4 grid rough in ok cover
ELE19-01406 Electrical Rough-In5/10/20195/13/20195/13/2019 9:30:36 AMAPASS
Rough in inspection of area A above the fire lid. Phone #: ###-#### Inspection requested via web by Tom Betty
A1 section 1 fire lids as noted on contractor print rough in ok cover
ELE19-00659 Final5/9/20195/13/20195/13/2019 9:05:35 AMANH
CONTACT: CALEB BURKE Phone #: ###-#### Inspection requested via web by Deb Gooden
No answer, left message to recall when accessible
ELE19-00934 Final5/10/20195/13/20195/10/2019 12:55:45 PMACANC
Phone #: ###-#### >> Inspection requested via web by Steven Ragan Inspection cancelled from web by: Steven Ragan