ELE19-01415
| Final | 5/14/2019 | 5/15/2019 | 5/15/2019 3:38:44 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Christy Cheney 210.62- Window that can be used for advertising shall have show window receptacles installed. All store front windows. Had verbal with wireman.
|
ELE19-01459
| Final | 5/15/2019 | 5/15/2019 | 5/15/2019 3:15:23 PM | P | FAIL |
|
|
The lock box code to get inside is 9781 Phone #: ###-#### Inspection requested via web by Jonathan Poot Unable to locate plans on site. provide and recall
|
ELE19-01064
| Final | 5/15/2019 | 5/15/2019 | 5/15/2019 2:47:31 PM | P | FAIL |
|
|
Hot tub wiring ready for final. Please call Jason at ###-#### when you are on the way. Thank you Phone #: ###-#### Inspection requested via web by Kelly Felin 680.22(A)(1)- A receptacle outlet shall be located with in 20' of waters edge but no closer than 6' of the spa or hot tub. 680.42(B)(4)- For hot tubs with top rim less than 28" above perimeter surfaces an equipotential bonding of perimeter surfaces is required.
|
ELE19-00913
| Final | 5/15/2019 | 5/15/2019 | 5/15/2019 2:14:08 PM | P | PASS |
|
|
Jake Phone #: ###-#### Final ok
|
ELE19-01783
| Temporary Service | 5/14/2019 | 5/15/2019 | 5/15/2019 1:01:18 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas t/s u/g n ok
|
ELE19-01785
| Rough-In Permanent Service | 5/14/2019 | 5/15/2019 | 5/15/2019 12:40:16 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson Rough in ok cover p/s u/g n ok
|
ELE19-01483
| Conference | 5/13/2019 | 5/15/2019 | 5/15/2019 12:00:06 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Dillon Discussed moving overhead fed meterbase off upper level deck to ground level. No changes to be made to interior panel which is split bus 100 amp. Want to locate meter to ground level, run conduit externally to below where original meter located, run up thru deck floor and LB into existing split bus panel. A max of 6 throws exist, ground rods to be added to grounding electrode system.
|
ELE19-00800
| Final | 5/14/2019 | 5/15/2019 | 5/15/2019 10:37:47 AM | A | PASS |
|
|
Robert Phone #: ###-#### Final ok
|
ELE19-00800
| Electrical Rough-In | 5/15/2019 | 5/15/2019 | 5/15/2019 10:37:26 AM | P | PASS |
|
|
Robert Phone #: ###-#### Heat pump rough in ok
|
ELE19-00934
| Final | 5/14/2019 | 5/15/2019 | 5/15/2019 10:11:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan Final ok
|
ELE19-01648
| Electrical Rough-In | 5/13/2019 | 5/15/2019 | 5/15/2019 9:51:07 AM | A | PASS |
|
|
Wall cover Phone #: ###-#### Inspection requested via web by David Feller Misc walls through out added for dividing wall and offices rough in ok cover
|
ELE19-01406
| Electrical Rough-In | 5/14/2019 | 5/15/2019 | 5/15/2019 9:37:45 AM | A | PASS |
|
|
Contact John for area A level 1 walls. Phone #: ###-#### Inspection requested via web by Tom Betty A1 sec. 1 top out 3 1/2' walls only rough in ok cover
|
ELE19-01652
| Electrical Rough-In | 5/14/2019 | 5/15/2019 | 5/15/2019 9:06:12 AM | A | PASS |
|
|
Requesting 9:00 am inspection time Replace existing lighting in pole sign to new led lighting. Phone #: ###-#### Inspection requested via web by Ken Olsen Listings confirmed. Rough in ok
|