ELE19-00672
| Final | 5/2/2019 | 5/3/2019 | 5/3/2019 3:08:59 PM | P | FAIL |
|
|
Will be on site all day Phone #: ###-#### Inspection requested via web by robert feller 110.3- Misc receptacles not working on south or cable walls. 110.26(D)- Luminaires installed for required illumination for electrical equipment shall not operate by automatic means. Remove motion sensors. 210.8(B)(7)- All 15 or 20 amp receptacle outlets located in locker rooms associated with shower areas shall have GFCI protection. TV receptacles. 250.64(E)- Grounding electrode conductors installed in ferrous metal raceways shall clamp to conductor at each end by fittings for clamps. 314.20- Where boxes are recessed in non combustible wall cover 1/4" or more they shall have spark rings installed. Bathrooms, south or cable walls. 700.3- Emergency lighting and exit signs shall operate when tested.
|
ELE19-01583
| Temporary Service | 5/3/2019 | 5/3/2019 | 5/3/2019 2:44:46 PM | P | PASS |
|
|
3rd time is a charm. Phone #: ###-#### Inspection requested via web by Shawna Gates t/s o/h n ok
|
ELE18-00602
| Electrical Rough-In | 5/3/2019 | 5/3/2019 | 5/3/2019 1:26:41 PM | P | PASS |
|
|
John- ceiling electrical inspection Phone #: ###-#### Hospital side grid, all except storage room. Exam or surgical lights have support system in but not luminaires. Rest of grid in this area rough in ok cover
|
ELE19-01261
| Electrical Rough-In | 5/3/2019 | 5/3/2019 | 5/3/2019 11:35:54 AM | A | PASS |
|
|
Inspection requested via web by Brad Girard Portion of basement taken apart for concrete pour. Inspection for rewiring of area. South basement area walls and ceiling rough in ok cover.
|
ELE19-01342
| Temporary Service | 5/3/2019 | 5/3/2019 | 5/3/2019 10:56:45 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark M t/s o/h n ok
|
ELE18-01935
| Electrical Rough-In | 5/2/2019 | 5/3/2019 | 5/3/2019 10:18:44 AM | A | PASS |
|
|
Unit 412 fire place Unit 407 fire place 2nd floor hall way Contact John (Homey) McElroy Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Discussed LED rope or tape lighting to penatrate ceiling to get to other side of bathroom would depend on manufacturers instructions if approved for such installation. Each bathroom receptacle is fed by dedicated circuits so could have LED lighting on with basin receptacle as per 210.11(C)(3). Units 407and 412 fireplaces and level 2 hall ceilings rough in ok cover.
|
ELE19-00288
| Final | 5/2/2019 | 5/3/2019 | 5/3/2019 9:16:52 AM | A | PASS |
|
|
Contact - Neil Adams ###-#### Phone #: ###-#### Inspection requested via web by Todd Alder No card posted. Final ok
|
ELE19-01583
| Temporary Service | 5/2/2019 | 5/3/2019 | 5/3/2019 8:26:00 AM | A | FAIL |
|
|
Shannon is the contact again Phone #: ###-#### Inspection requested via web by Shawna Gates Corrections not complete
|