ELE17-03964
| Final | 6/11/2018 | 6/12/2018 | 6/12/2018 4:56:50 PM | A | PASS |
|
|
Job Foreman: Jay Karel Phone #: ###-#### Inspection requested via web by Laurie Hoelscher final ok
|
ELE17-01337
| Conference | 6/12/2018 | 6/12/2018 | 6/12/2018 2:52:36 PM | P | DONE |
|
|
TCO meeting items to complete. Roof HVAC fuses- M3 35,37- 25a max, M3 34,35-55a max, M3 38,40- 25a max, M1 20,22,24- 50a max. Level 5- 518 bath lighting, Level 4- 419 bath lighting, Level 3- 328 not ready, check misc receptacles at coffee bars for spark rings. 325 coffee bar not done. Level 2- 212, 214, 218, 222, 224, 228 not ready. 217 switched power. Level 1- Kitchen area incomplete, not tested, lobby area misc open wiring coffee bar, bar area not done, pool area and equipment not done, east HVAC not complete, west stair lighting not done, guest rooms not done, electrical room open boxes, gutters, labels incomplete. Lockout HVAC units in all rooms due to receptacle located behind cover screwed in place. Front landscape not complete, open wiring in misc conduits. Check elevator car lighting over current devices are 15 amp. Meeting room and corridor not tested. Confirm EPD devices for heat tape level 2 roof.
|
ELE18-01333
| Permanent Service | 6/11/2018 | 6/12/2018 | 6/12/2018 1:59:24 PM | P | PASS |
|
|
Tony is contact. 208.447.7612 Phone #: ###-#### Inspection requested via web by Clint Tate Check 2" bushing in meter base, original one cut. discussed fireplace changing to TV wall and bed closet removed for TV wall. Bathroom remodelled told shall have dedicated 20 amp receptacle circuit. p/s u/g rec ok
|
ELE18-02196
| Conference | 6/12/2018 | 6/12/2018 | 6/12/2018 1:40:54 PM | P | DONE |
|
|
call when on way /// Thomas Phone #: ###-#### Discussed code requirements for a bathroom being added. Wiring done with receptacle fed off bedroom. informed of dedicated 20 amp bathroom receptacle circuit, with tamper resistant, GFCI protection required. Will call for a rough in when ready.
|
ELE18-00727
| Electrical Rough-In | 6/11/2018 | 6/12/2018 | 6/12/2018 11:14:07 AM | A | PASS |
|
|
Pole bases Phone #: ###-#### Inspection requested via web by Tom Jenkins Pole bases rough in ok cover
|
ELE18-01935
| Electrical Rough-In | 6/12/2018 | 6/12/2018 | 6/12/2018 11:13:18 AM | A | PASS |
|
|
Ground work N.E.corner of building Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Underground east side to grid line 4 rough in ok cover
|
ELE18-01573
| Electrical Rough-In | 6/12/2018 | 6/12/2018 | 6/12/2018 9:42:44 AM | A | PASS |
|
|
Ceiling cover. Von is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Grid rough in ok cover
|
ELE18-01457
| Electrical Rough-In | 6/12/2018 | 6/12/2018 | 6/12/2018 9:34:02 AM | A | PASS |
|
|
Call Brad(###-####) for access Phone #: ###-#### Inspection requested via web by Brad Girard Contractor to pull seperate permit and attach to BLD for suite 670 corridor and vanilla space. Grid rough in ok cover
|
ELE18-02175
| Temporary Service | 6/11/2018 | 6/12/2018 | 6/12/2018 8:55:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s o/h n ok
|
ELE18-01289
| Final | 6/11/2018 | 6/12/2018 | 6/12/2018 8:39:07 AM | A | PASS |
|
|
Garage 0243 Phone #: ###-#### Inspection requested via web by Heath Thomas Final ok
|
ELE14-00475
| Conference | 6/4/2018 | 6/12/2018 | 6/11/2018 2:49:29 PM | A | CANC |
|
|
Check for progress on permit for HVAC units on roof east end. Minisplit units. Wrong permit created
|