ELE19-01520
| Final | 6/7/2019 | 6/7/2019 | 6/7/2019 2:57:35 PM | P | PASS |
|
|
Gfci recaps installed ready for re inspection Phone #: ###-#### Inspection requested via web by Kevin Oderkirk Final ok
|
ELE19-01406
| Electrical Rough-In | 6/7/2019 | 6/7/2019 | 6/7/2019 2:22:35 PM | P | PASS |
|
|
Contact John Mittlieder for Level 1 A1 walls. Level 2 bathroom ceilings and top out rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Level 1 A1 walls and level 2 A1 bathrooms and corridor fire lids and top out rough in ok cover
|
ELE19-00770
| Final | 6/6/2019 | 6/7/2019 | 6/7/2019 1:25:40 PM | P | PART |
|
|
Partial Phone #: ###-#### Inspection requested via web by Kerri Hamilton Shop, bull pen, break rm, conference rm, 109, 110 and reception area TCO ok
|
ELE19-00797
| Final | 6/6/2019 | 6/7/2019 | 6/7/2019 12:04:55 PM | A | PASS |
|
|
Inspection requested via web by BRS Permitting Final ok
|
ELE19-01890
| Electrical Rough-In | 6/6/2019 | 6/7/2019 | 6/7/2019 12:04:29 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Level 1 bathrooms rough in ok cover
|
ELE19-01984
| Final | 6/5/2019 | 6/7/2019 | 6/7/2019 11:20:03 AM | A | PASS |
|
|
final on hot tub inspection that needed a new plastic fixture installed. fixture has been replaced and picture sent to Darrell Phone #: ###-#### Inspection requested via web by A.M.E. Office As per Daryl DeGrange he has notes of item in question. Final ok
|
ELE19-00930
| Final | 6/6/2019 | 6/7/2019 | 6/7/2019 11:18:53 AM | A | FAIL |
|
|
Garage Code 4053 Phone #: ###-#### Inspection requested via web by Dean Gernaat 314.16- Boxes shall be of sufficient size for all conductors installed. 8 cubic inch box installed for island receptacle 11.25 cubic inches of conductor installed. * Fee charged is for service up to 200 amp only $55.00. Fee for dwelling required. Additional $80.00 total of $135.00 required.
|
ELE18-03224
| Permanent Service | 6/6/2019 | 6/7/2019 | 6/7/2019 10:08:48 AM | A | CANC |
|
|
Contact: Wes powell Phone #: ###-#### Inspection requested via web by Deb Gooden Needed rough in inspection.
|
ELE18-03224
| Electrical Rough-In | 6/7/2019 | 6/7/2019 | 6/7/2019 10:08:31 AM | P | PASS |
|
|
Contact: Wes powell Phone #: ###-#### Inspection requested via web by Deb Gooden Inspect old service gear located in existing portion of school now sub fed from new service. Rough in ok
|
ELE19-01648
| Final | 6/6/2019 | 6/7/2019 | 6/7/2019 9:30:31 AM | A | FAIL |
|
|
Final inspection. Phone #: ###-#### Inspection requested via web by David Feller See ceiling rough in inpection.
|
ELE19-01648
| Rough-In Permanent Service | 6/6/2019 | 6/7/2019 | 6/7/2019 9:29:59 AM | A | FAIL |
|
|
Ceiling cover inspection. Phone #: ###-#### Inspection requested via web by David Feller 210.8- All 15 and 20 amp 120 volt receptacle outlets located with in 6' of a sink shall have GFCI protection. Break room. 314.25- All boxes shall have covers. Reception and waiting areas. *BLD19-01289 lists break room as being created under this permit and shall be part of scope of work.
|