ELE18-04106
| Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 2:40:56 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher BLD must be issued proir to any electrical inspection. 300.15- All cables and conduits shall terminate in a box. Wiring left hanging where old sign had been removed.
|
ELE18-01929
| Permanent Service | 7/16/2019 | 7/16/2019 | 7/16/2019 2:11:59 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk p/s o/h rec ok
|
ELE19-00602
| Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 1:42:32 PM | P | PASS |
|
|
Garage concrete pour cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Report has been given of someone with general contractor removing electrical conduits with out informing electrical contractor. BCC 4-05-15 It shall be unlawful for any person to engage in electrical work without first having a electrical journeymans license and be employed by an electrical licenced and permitted electrical contractor. First and only warning, if any electrical wiring , conduit, or equipment is installed or removed without consulting electrical foreman of licensed and permitted electrical contractor a compliance inspector from the State of Idaho will be brought on site to discuss penalties and fines up to $1000 that may be assessed for each infraction. Level 2 west pour as noted on contractor print rough in ok cover
|
ELE19-01669
| Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 11:51:22 AM | A | PASS |
|
|
electrical rough in Phone #: ###-#### Inspection requested via web by Tim Dunlop 250.53- A single ground rod shall have a suppemental rod installed unless proven less that 25ohms to ground by final. #8 SER 40amp max installed for range circuit. Rough in ok cover
|
ELE19-02621
| Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 11:09:25 AM | A | NR |
|
|
Rough in inspection and consult with a few questions regarding job. Corbin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Rough in not ready Discussed removing subfeed from house to garage due to equipment ground must be added and small conduit between. Metal underground water pipe from house to garage must be added to grounding electrode system. Up bath does not have a basin in stool room so dedicated circuit not required. If clothes rod present in closet then AFCI protection required upstairs. Contractor believes he will pull sub feed to panel in garage from service mounted on garage eliminating most code issues.
|
ELE19-01406
| Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 10:12:40 AM | A | PASS |
|
|
Level 1 area B ceilings and walls. Phone #: ###-#### Inspection requested via web by Tom Betty Area B except 104, 105, 106, 118, 119, 122, 124, 162. Rest of walls and hardlids rough in ok cover
|
ELE18-01935
| Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 9:37:49 AM | A | PASS |
|
|
North Half - 5th Floor Hall Ceiling Inspection Contact electrician John (Homey) McElroy Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek North and south corridor ceiling to center stair rough in ok cover
|