ELE16-00089
| Electrical Rough-In | 8/22/2016 | 8/23/2016 | 8/23/2016 2:25:02 PM | P | PASS |
|
|
Call Bob for inspection of ceiling grid in Clearwater building side and ballroom and for inspection of walls on 2nd floor near stair 5. Phone #: ###-#### Inspection requested via web by Rafael Castillo Hall grid 411, 425, meeting rooms 414, 415, 416 grid, ballroom B, C grid. Area B speakers not in place. Rough in ok cover
|
ELE16-01628
| Final | 8/23/2016 | 8/23/2016 | 8/23/2016 2:14:40 PM | P | PART |
|
|
Temp Occ Phone #: ###-#### Inspection requested via web by Kerri Hamilton Front covered entrance yet to complete, temp egress lighting in place. Temp final ok for training
|
ELE15-02401
| Final | 8/23/2016 | 8/23/2016 | 8/23/2016 2:02:46 PM | P | PASS |
|
|
Seth Phone #: ###-#### Site lighting final ok
|
ELE15-02740
| Final | 8/23/2016 | 8/23/2016 | 8/23/2016 2:02:02 PM | P | PART |
|
|
Seth-partial office equipement Phone #: ###-#### 1st floor switches in furniture installed is boxes. OK to occupy
|
ELE16-02717
| Rough-In Permanent Service | 8/23/2016 | 8/23/2016 | 8/23/2016 12:26:16 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Rohl Rough in ok cover p/s u/g n ok
|
ELE16-01653
| Final | 8/22/2016 | 8/23/2016 | 8/23/2016 11:37:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by JENNY EMEL Final ok
|
ELE16-02693
| Conference | 8/22/2016 | 8/23/2016 | 8/23/2016 10:56:43 AM | A | DONE |
|
|
Call Rafael to discuss old service in parking garage pertaining to vault relocation. Phone #: ###-#### Inspection requested via web by Rafael Castillo Discussed the pulling of wire on load side of disconnect. Service change yet to be completed by others, height may change depending on how contractor chooses to assemble new service.
|
ELE16-01416
| Electrical Rough-In | 8/22/2016 | 8/23/2016 | 8/23/2016 10:13:00 AM | A | PASS |
|
|
Wet nich potting compound Phone #: ###-#### Inspection requested via web by Emmet Bushman Rough in ok cover
|
ELE16-02743
| Electrical Rough-In | 8/22/2016 | 8/23/2016 | 8/23/2016 9:56:42 AM | A | PASS |
|
|
Inspection requested via web by Terry Scott Master bath shower and stool lighting, and basement rec room lights and 2 outlet adds. Patch work rough in ok cover
|
ELE16-02680
| Electrical Rough-In | 8/23/2016 | 8/23/2016 | 8/23/2016 9:29:47 AM | A | PASS |
|
|
Phone #: 8694676 >> Inspection requested via mobile web by Barry Spencer Listing confirmed and discussed rearranging circuits in panel, to make sure multi wire circuits on seperate phases. Rough in ok
|
ELE16-02506
| Final | 8/22/2016 | 8/23/2016 | 8/23/2016 9:16:33 AM | A | PASS |
|
|
Please call Madison ###-#### when you are on the way. Thank You. If you have any questions, you can call Luke at ###-####. Phone #: ###-#### Inspection requested via web by Clay Morgan Final ok
|
ELE16-02506
| Electrical Rough-In | 8/22/2016 | 8/23/2016 | 8/23/2016 9:15:38 AM | A | PASS |
|
|
Please call Madison ###-#### when you are on the way. Thank You. If you have any questions, you can call Luke at ###-####. Phone #: ###-#### Inspection requested via web by Clay Morgan All wiring fished in walls or surface mounted. Rough in ok
|
ELE16-02702
| Final | 8/22/2016 | 8/23/2016 | 8/23/2016 8:48:44 AM | A | NR |
|
|
i installed 2nd ground rod and Noalox compound. Please come as soon as possible. Idaho power is coming on 8/23 to connect transformer to panel. Thank you for your time Phone #: ###-#### Inspection requested via web by alfredo arteaga Needed p/s inspection Service added to garage. All branch circuits have not been pulled yet.
|
ELE16-02702
| Permanent Service | 8/23/2016 | 8/23/2016 | 8/23/2016 8:46:48 AM | P | PASS |
|
|
i installed 2nd ground rod and Noalox compound. Please come as soon as possible. Idaho power is coming on 8/23 to connect transformer to panel. Thank you for your time Phone #: ###-#### Inspection requested via web by alfredo arteaga p/s o/h n ok
|
ELE16-02626
| Electrical Rough-In | 8/22/2016 | 8/23/2016 | 8/23/2016 8:38:22 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Paula Gratiot Rough in ok cover
|
ELE16-00089
| Electrical Rough-In | 8/22/2016 | 8/23/2016 | 8/22/2016 1:07:55 PM | P | CANC |
|
|
Call Bob for inspection of ceiling grid in ballroom C. Phone #: ###-#### >> Inspection requested via web by Rafael Castillo Inspection cancelled from web by: Rafael Castillo
|