Inspections for the day of: Monday, August 26, 2019.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03134 Final8/23/20198/26/20198/26/2019 2:31:57 PMPPASS
Call Fred with questions please ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan
Labels complete. Final ok
ELE19-03134 Permanent Service8/20/20198/26/20198/26/2019 2:29:27 PMPPASS
Please call Fred with any questions ###-####. Thanks! Phone #: ###-#### Inspection requested via web by Clayton Morgan No other work performed just raised over head mast. p/s o/h rec ok
ELE19-00374 Final8/23/20198/26/20198/26/2019 1:49:14 PMAFAIL
Phone #: ###-#### Inspection requested via web by TOM BICANDI
250.94(A)(1)- Inter system bond shall be accessible for use.Buried in trim work.
410.16- Luminaires located in closet shall be installed at least 12" from storage shelf.
BCC 4-05-24(D)- Electrical inspector shall have access to all areas work has been done. Detached garage and mechanical closet on exterior.
ELE18-04603 Final8/23/20198/26/20198/26/2019 1:44:22 PMAFAIL
Phone #: ###-#### Inspection requested via web by TOM BICANDI
356.30(1)- LFNC when installed in lengths greater than 6' shall have supports not to exceed 3' in length. AC
440.6- Overcurrent protection for AC unit shall not exceed value on name plate. 25 amp max 30 amp installed.
ELE19-03082 Final8/24/20198/26/20198/26/2019 12:23:49 PMAPASS
Corrections have been made since last inspection. Phone #: ###-#### Inspection requested via web by Dan Hilke
Final ok
ELE18-01935 Electrical Rough-In8/23/20198/26/20198/26/2019 9:48:51 AMAPASS
John Phone #: ###-####
All levels server room drop lids, Level 3 public bathroom droplid, must have larger access, Level 4 406 floor heat rough in ok cover
ELE19-03174 Electrical Rough-In8/23/20198/26/20198/26/2019 9:25:51 AMAPART
Please call Mike H. Phone #: ###-#### Inspection requested via web by Kevin Perez Discussed if equipment grounding conductors were required to switch bank where box fill tight. Electrical engineer has drawn in equipment grounding conductors on print so will be required to be installed.
kitchen walls and salad wall as noted on contractor print rough in ok cover