Inspections for the day of: Monday, September 23, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03295 Rough-In Permanent Service9/23/20199/23/20199/23/2019 3:42:08 PMPPASS
call lance for access 208 703 2035
Inspection of sub panel feeder and panel from main service for meter to be set Phone #: ###-#### Inspection requested via web by David Feller
Panel and feeders to panel rough in ok.
p/s u/g n ok
ELE19-00602 Electrical Rough-In9/23/20199/23/20199/23/2019 2:26:01 PMPPASS
PT deck concrete pour. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen
PT deck ramp from level 3 to 4 and around to south on west side pour rough in ok cover.
ELE19-03015 Final9/23/20199/23/20199/23/2019 1:53:13 PMPPART
Permit to remain open for additional work still to complete.
MC whip located at truss level shall terminate in a box as per 300.15.
Open box located above coffee bar shall be covered as per 314.25.
TCO of coffee bar only OK
ELE19-03015 Electrical Rough-In9/23/20199/23/20199/23/2019 1:50:01 PMPPASS
Keegan Phone #: ###-####
Cloud rough in.
ELE19-03582 Conference9/20/20199/23/20199/23/2019 12:37:13 PMADONE
Call for Acess- Greg Phone #: ###-####
Pamphlet given, owner has done electrical work on previous houses he has owned. He has a good under standing of basic wiring. Kitchen area not opened up. All new to be toward back of house from kitchen pantry cabinet towards back. 1/2 of master bed existing and 1/2 towards back new. Discussed AFCI protection, tamper resistant receptacles, GFCI protection, dedicated bathroom receptacle circuit, Smokes, AC requirements, and inspections when needed.
ELE19-03496 Electrical Rough-In9/20/20199/23/20199/23/2019 11:56:04 AMAPASS
Uffer ground inspection for the Crane Power.
Contact Shawn Evins.
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Item noted rough in ok cover
ELE16-03043 Final9/20/20199/23/20199/23/2019 9:24:53 AMAPASS
Please call Shane Synndergaard when you are heading to the job. He is the only one that can let you in for access. Phone #: ###-#### Inspection requested via web by Ben Archibald Final ok
ELE19-03586 Permanent Service9/22/20199/23/20199/23/2019 9:06:45 AMAPASS
Phone #: ###-#### Inspection requested via web by Hidajet Zahic
All personal items have been removed. All fire damage on east wall of upper level. Contacted contractor and all damaged wiring has been capped off. Under ground metal water pipe to left of panel shall be supplemented by additional rod by final. p/s o/h rec ok