ELE19-00895
| Final | 9/25/2019 | 9/26/2019 | 9/26/2019 2:51:12 PM | P | PART |
|
|
Electrical final, Brett is the contact. Phone #: ###-#### Inspection requested via web by Deb Ipsen 210.8(B)- All 120 volt receptacles located in kitchen area shall have GFCI protection. Left of serving window and right of ovens on 1/2 wall. 440.6- Fuse for small roof top unit min fuse over 30 amp, 30 amp fuses installed in disconnect. Contractor to correct by the time we do an AM fly by. Ovens from existing kitchen to be brought over at future time. Will need to verify these connections. TCO OK
|
ELE19-03226
| Electrical Rough-In | 9/26/2019 | 9/26/2019 | 9/26/2019 2:49:14 PM | P | PASS |
|
|
Call with any questions. We''re on site Phone #: ###-#### Inspection requested via web by Kory Peterson Entry and entry dividing wall not ready. Bathrooms, kitchen, back corridor walls and hardlids rough in ok cover
|
ELE19-00789
| Final | 9/25/2019 | 9/26/2019 | 9/26/2019 1:37:41 PM | P | PASS |
|
|
electrical final for service on module classroom. Service was overhead and is now underground. Phone #: ###-#### Inspection requested via web by Deb Ipsen Final ok
|
ELE19-02900
| Final | 9/25/2019 | 9/26/2019 | 9/26/2019 12:09:45 PM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Debby Pierce Phase 1 TCO ok
|
ELE19-03636
| Electrical Rough-In | 9/25/2019 | 9/26/2019 | 9/26/2019 11:27:54 AM | A | PASS |
|
|
Underground and bonding for swimming pool Phone #: ###-#### Inspection requested via web by Lars Johnson Underground and bonding from equipment to shell, 4 corners, and bond rough in ok cover.
|
ELE19-02712
| Final | 9/26/2019 | 9/26/2019 | 9/26/2019 11:10:28 AM | P | FAIL |
|
|
590.6(B)- All temp power other than 120 volt shall have GFCI protection. 250 did not trip when spot checked.
|
ELE19-03589
| Rough-In Permanent Service | 9/26/2019 | 9/26/2019 | 9/26/2019 10:47:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn Underground not complete, expansion joint not in place. Rough in ok cover p/s u/g n ok
|
ELE19-03635
| Temporary Service | 9/26/2019 | 9/26/2019 | 9/26/2019 10:46:20 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn t/s u/g n ok
|
ELE19-03342
| Rough-In Permanent Service | 9/26/2019 | 9/26/2019 | 9/26/2019 10:24:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn Underground to service in a different location. Attic boxes trimmed on rough in around furnace. Rough in ok cover p/s u/g n ok
|
ELE19-03488
| Electrical Rough-In | 9/25/2019 | 9/26/2019 | 9/26/2019 9:52:03 AM | A | PASS |
|
|
Wall R/I cover inspection west of elevators. Please call Luke for any questions. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo All walls east of elevator rough in ok cover
|
ELE19-03270
| Final | 9/26/2019 | 9/26/2019 | 9/26/2019 9:08:39 AM | A | FAIL |
|
|
Final inspection for mini cell site. Contact Alex Ybarra Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek 250.24- A grounding electrode conductor shall be connected to the grounded conductor at the service main discnnecting means. Grounds and neutrals seperated at time of inspection.
|