Inspections for the day of: Friday, September 27, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03664 Electrical Rough-In9/26/20199/27/20199/27/2019 2:47:59 PMPPASS
Phone #: ###-#### Inspection requested via web by Tom Jenkins
Work room walls only rough in ok cover.
ELE19-02626 Electrical Rough-In9/26/20199/27/20199/27/2019 2:27:24 PMPPASS
Ceiling cover inspection for 6 can lights in the walkway and 1 can light above the staircase landing.
Contact Josh Slater.
Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek
Asked to terminate old temp MC for an exit sign which was cut off even with wall. Either terminate in a box or abandon and remove. Thanks.
Areas noted only rough in ok cover
ELE19-02034 Final9/26/20199/27/20199/27/2019 12:47:36 PMAFAIL
Please call 30 minutes in advance if possible so I can meet and let you onsite. Phone #: ###-#### Inspection requested via web by Steve McCloy
300.15- All cables and conduits shall terminate in a box or enclosure. Loose wiring hanging from conduits in all areas shall terminate in boxes.
ELE19-03270 Final9/26/20199/27/20199/27/2019 12:11:49 PMAPASS
Mini cell site inspection
Contact Alex Ybarra
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
ELE19-03665 Conference9/26/20199/27/20199/27/2019 11:17:15 AMADONE
Conference for weekend work with Idaho Power
Contact Pierre Elskamp
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
Discussed changing services fro overhead to under ground service entrance. All OK
ELE19-03665 Permanent Service9/27/20199/27/20199/27/2019 11:16:15 AMPPASS
Conference for weekend work with Idaho Power
Contact Pierre Elskamp
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
Changing from overhead to underground service entrance. 220 w Broad st and 314 s 3rd st. services ok to reconnect. p/s u/g rec ok
ELE19-02715 Final9/26/20199/27/20199/27/2019 10:45:43 AMAPART
Please contact Bill at ###-#### when enroute. Phone #: ###-#### Inspection requested via web by Debby Pierce
TCO phase 1 only. Medium conference floor receptacles disconnected until complete.
ELE19-03462 Final9/26/20199/27/20199/27/2019 9:27:44 AMAPASS
If any extra information needed you can call Bill @ ###-#### Phone #: ###-#### Inspection requested via web by Sherry Allen
Final ok
ELE19-03462 Permanent Service9/27/20199/27/20199/27/2019 9:27:21 AMPPASS
If any extra information needed you can call Bill @ ###-#### Phone #: ###-#### Inspection requested via web by Sherry Allen
p/s u/g n ok
ELE19-03671 Rough-In Permanent Service9/26/20199/27/20199/27/2019 8:32:38 AMAPASS
Phone #: ###-#### Inspection requested via web by Dean Gernaat
Rough in ok cover p/s u/g n ok