ELE19-03267
| Final | 10/18/2019 | 10/18/2019 | 10/18/2019 2:04:41 PM | P | PASS |
|
|
garage code 2468, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn final ok
|
ELE19-03265
| Final | 10/18/2019 | 10/18/2019 | 10/18/2019 2:03:10 PM | P | PASS |
|
|
garage code 2468, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn final ok
|
ELE19-00849
| Final | 10/17/2019 | 10/18/2019 | 10/18/2019 11:45:40 AM | A | PART |
|
|
Final for Building #8B Phone #: ###-#### Inspection requested via web by Stuart Welton Patial final only ok (exterior lighting fed from temp panel. Will be fed from Site lighting control panel once building is constructed.)
|
ELE19-04021
| Electrical Rough-In | 10/17/2019 | 10/18/2019 | 10/18/2019 11:41:33 AM | A | PASS |
|
|
Underground inspection for Building #4 Phone #: ###-#### Inspection requested via web by Stuart Welton underground only ok to cover
|
ELE19-03998
| Electrical Rough-In | 10/17/2019 | 10/18/2019 | 10/18/2019 10:16:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brandon Winters Open j-box in attic shall be covered Need to verify cover before final. Entry only rough in ok
|
ELE19-04020
| Electrical Rough-In | 10/17/2019 | 10/18/2019 | 10/18/2019 9:31:59 AM | A | PASS |
|
|
please call prior to arrival Phone #: ###-#### Inspection requested via web by Patrick Paz Kitchen only ok to cover. Switches will be fished in next to fireplace after half wall is removed. no need for rough in inspection.
|
ELE19-03966
| Electrical Rough-In | 10/14/2019 | 10/18/2019 | 10/14/2019 4:48:19 PM | A | CANC |
|
|
Listing inspection for solar equipment; The racking, cable management and penetrations are visible, with solar panels and inverters on the ground for viewing; The crew will be there from 8 to 1 Phone #: ###-#### >> Inspection requested via web by Ryan King Inspection cancelled from web by: Ryan King
|