ELE18-03614
| Final | 10/24/2018 | 10/24/2018 | 10/24/2018 2:16:09 PM | P | PASS |
|
|
Any Questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller hot tub only final ok
|
ELE18-01206
| Permanent Service | 10/24/2018 | 10/24/2018 | 10/24/2018 1:33:56 PM | P | CANC |
|
|
Please call Chris to discuss permanent power inspection. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
|
ELE18-01206
| Conference | 10/24/2018 | 10/24/2018 | 10/24/2018 1:33:39 PM | P | DONE |
|
|
Please call Chris to discuss permanent power inspection. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Talked about requirments of 230.95C. On site preformance testing. 110.26C3 Personel doors and hardware.( Panic hardware not reequired for perm service but shall be installed as soon as possible. No final without hardware in place.)
|
ELE18-02072
| Final | 10/24/2018 | 10/24/2018 | 10/24/2018 12:54:44 PM | P | PART |
|
|
Aaron Phone #: ###-#### 400.12 Cords shall not pass through dropped ceiling.( 2 TV's in front lobby)
|
ELE18-01391
| Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 11:59:04 AM | A | PASS |
|
|
Call Scott for level 3 therapist work room rough in walls inspection. Phone #: ###-#### Inspection requested via web by Tom Betty As marked on print ok to cover
|
ELE18-03730
| Conference | 10/23/2018 | 10/24/2018 | 10/24/2018 11:31:50 AM | A | PASS |
|
|
Please contact Ron Pontius upon arrival at the B26 lobby Phone #: ###-#### Inspection requested via web by Ron Pontius Discussed running PVC coated MC in Metal wireway. Discussed bonding of raceway and weather tight entrance into transformer.
|
ELE18-04091
| Final | 10/23/2018 | 10/24/2018 | 10/24/2018 11:30:20 AM | A | PASS |
|
|
Final inspection for Fisher''s Tenant Improvement Phone #: ###-#### Inspection requested via web by Kevin Perez Final ok
|
ELE18-02000
| Final | 10/23/2018 | 10/24/2018 | 10/24/2018 11:20:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jerry Moore corrections made final ok
|
ELE18-02715
| Final | 10/23/2018 | 10/24/2018 | 10/24/2018 10:53:21 AM | A | PASS |
|
|
Please call Ron when you arrive on site. The B26 lobby is the closest to the B29 job site. Phone #: ###-#### Inspection requested via web by Ron Pontius Final ok
|
ELE18-02216
| Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 10:51:25 AM | A | PASS |
|
|
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Remaining wall in conference room ok to cover
|
ELE18-04069
| Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 9:01:28 AM | A | CANC |
|
|
still changing out the main breaker and need something from you to reconnect Phone #: ###-#### Inspection requested via web by Andy Derrick Needed perm serv
|
ELE18-04069
| Permanent Service | 10/24/2018 | 10/24/2018 | 10/24/2018 9:01:04 AM | A | PASS |
|
|
still changing out the main breaker and need something from you to reconnect Phone #: ###-#### Inspection requested via web by Andy Derrick Breaker changed from 200A to 175A. p/s u/g rec ok
|
ELE18-04069
| Final | 10/22/2018 | 10/24/2018 | 10/23/2018 10:53:39 AM | A | FAIL |
|
|
Idaho Power will pull the meter at 9am so I can change the main breaker. It won''t take me long (20 minutes) and I''ll be leaving. Everything else is done now. Idaho Power might hang out and re-energize without your sticker, depends on the guy. Phone #: ###-#### Inspection requested via web by Andy Derrick No ispections done on solar array. No permit covering electrical from array.
|