ELE12-01744
| ELE-Aging Inspection | 12/6/2018 | 12/6/2018 | 12/13/2018 10:59:15 AM | | FAIL |
|
|
No responce to notice No final scheduled at this time
|
ELE18-03039
| Final | 12/6/2018 | 12/6/2018 | 12/6/2018 1:41:39 PM | P | PASS |
|
|
mucho Phone #: ###-#### Final ok
|
ELE18-04544
| Electrical Rough-In | 12/6/2018 | 12/6/2018 | 12/6/2018 12:42:29 PM | P | PASS |
|
|
Call Electrician one hour prior to arrival: Barry Spencer: ###-#### Phone #: ###-#### Inspection requested via web by Rob Maes rough in ok Adding 6 panels to system
|
ELE18-04637
| Electrical Rough-In | 12/6/2018 | 12/6/2018 | 12/6/2018 12:35:16 PM | A | PASS |
|
|
Please call Rafael for wall R/I inspection of 1st floor milkwork. Phone #: ###-#### Inspection requested via web by Rafael Castillo Millwork ok. (Note: Inspections done under permit ELE18-01206 on interior of building, other than ground work, shall serve as rough in on this permit.)
|
ELE18-01391
| Rough-In Permanent Service | 12/6/2018 | 12/6/2018 | 12/6/2018 12:14:45 PM | A | CANC |
|
|
Call Tony Keen for utility transformer secondary terminations and Main Switchboard main breaker terminations. Phone #: ###-#### Inspection requested via web by Tom Betty
|
ELE18-01391
| Electrical Rough-In | 12/6/2018 | 12/6/2018 | 12/6/2018 12:14:24 PM | P | PASS |
|
|
Call Tony Keen for utility transformer secondary terminations and Main Switchboard main breaker terminations. Phone #: ###-#### Inspection requested via web by Tom Betty Connections at Transformer Secondary and main disconnect ok.. (230.95C Performance testing needed) (110.24A Available fault current needed)
|
ELE18-03004
| Electrical Rough-In | 11/29/2018 | 12/6/2018 | 12/6/2018 11:20:13 AM | A | PASS |
|
|
Plans have been left on site in the meter box Phone #: ###-#### Inspection requested via web by Ashley White Inspected panel and disc. Ready for final after array has been installed
|
ELE18-04211
| Final | 12/3/2018 | 12/6/2018 | 12/6/2018 11:11:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle Final ok
|
ELE18-04211
| Electrical Rough-In | 12/6/2018 | 12/6/2018 | 12/6/2018 11:09:24 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle Rough in ok
|
ELE18-03664
| Final | 12/5/2018 | 12/6/2018 | 12/6/2018 10:19:09 AM | A | PASS |
|
|
Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Corrections made final ok
|
ELE18-03585
| Final | 12/5/2018 | 12/6/2018 | 12/6/2018 10:18:43 AM | A | PASS |
|
|
Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Corrections made final ok
|