ELE08-01084
| ELE-Aging Inspection | 2/10/2020 | 2/10/2020 | 2/11/2020 6:40:14 AM | | DONE |
|
|
On going project. Have spoke to owner. He will finish soon.
|
ELE19-04617
| Electrical Rough-In | 2/7/2020 | 2/10/2020 | 2/10/2020 2:45:35 PM | P | PASS |
|
|
upstairs bedroom, downstairs living room and patio also added an outdoor outlet for ac servicing... Phone #: ###-#### Inspection requested via web by Richard Gratiot Up bed, Down living and Patio cover only ok to cover
|
ELE20-00469
| Electrical Rough-In | 2/10/2020 | 2/10/2020 | 2/10/2020 1:57:28 PM | P | FAIL |
|
|
Ufer ground on NE of building Phone #: ###-#### Inspection requested via web by Jim Williams 2/0 copper ufer called for in one line. #4 installed install 2/0 and re-call
|
ELE19-04513
| Electrical Rough-In | 2/10/2020 | 2/10/2020 | 2/10/2020 1:15:55 PM | P | PASS |
|
|
2nd level pour 2 Phone #: ###-#### Inspection requested via web by Stephanie Huston area listed ok to cover
|
ELE20-00465
| Electrical Rough-In | 2/9/2020 | 2/10/2020 | 2/10/2020 9:57:29 AM | A | PASS |
|
|
Inspection requested via web by John VanZandt Garage unchanged. Sheetrock removed above panel. Complete house rewire. OK to cover
|
ELE19-04721
| Final | 2/7/2020 | 2/10/2020 | 2/10/2020 9:12:04 AM | A | PASS |
|
|
call Bryan 15 minutes before you head over and he will meet you ###-#### he is job foreman Phone #: ###-#### Inspection requested via web by kevin blackmon Final ok
|
ELE19-03123
| Electrical Rough-In | 2/8/2020 | 2/10/2020 | 2/10/2020 8:49:25 AM | A | PASS |
|
|
As per our discussion at previous inspection, everything is bonded, switches and plugs installed but not buttoned up. Phone #: ###-#### Inspection requested via web by Sabrina McCleve Device grounding pig tails ok
|
ELE20-00400
| Electrical Rough-In | 2/7/2020 | 2/10/2020 | 2/10/2020 8:28:50 AM | A | CANC |
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon
|