ELE19-03021
| Final | 2/4/2020 | 2/4/2020 | 2/4/2020 2:03:38 PM | P | PASS |
|
|
The cubicles were installed and the facility is ready for final inspection. Please call Paul if there are any questions ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean furniture set final ok
|
ELE20-00404
| Electrical Rough-In | 2/4/2020 | 2/4/2020 | 2/4/2020 1:44:56 PM | P | PASS |
|
|
Underground inspection Building #12. Thank you Phone #: ###-#### Inspection requested via web by Stuart Welton conduiy stubs under footing only ok to cover
|
ELE19-00847
| Rough-In Permanent Service | 2/4/2020 | 2/4/2020 | 2/4/2020 1:30:53 PM | P | PASS |
|
|
Inspection Building #11 for rough-in permanent service. Thank you Phone #: ###-#### Inspection requested via web by Stuart Welton p/s u/g n ok
|
ELE20-00401
| Temporary Service | 2/4/2020 | 2/4/2020 | 2/4/2020 12:54:30 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE20-00188
| Final | 2/3/2020 | 2/4/2020 | 2/4/2020 11:55:54 AM | A | PASS |
|
|
If you need to check breakers there is a key in west disconnect inside disconnect. Phone #: ###-#### Inspection requested via web by shane miller corrections made final ok
|
ELE19-03474
| Final | 2/3/2020 | 2/4/2020 | 2/4/2020 10:58:24 AM | A | PASS |
|
|
Electrical final. Phone #: ###-#### Inspection requested via web by Deb Morton No sign off sheet onsite Exterior complete final ok
|
ELE20-00399
| Electrical Rough-In | 2/3/2020 | 2/4/2020 | 2/4/2020 10:51:13 AM | A | PASS |
|
|
For access please call Ed 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott kitchen only ok to cover
|
ELE19-04938
| Rough-In Permanent Service | 2/3/2020 | 2/4/2020 | 2/4/2020 10:33:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Zane Robertson rough in ok p/s u/g n ok
|
ELE20-00307
| Electrical Rough-In | 2/3/2020 | 2/4/2020 | 2/4/2020 9:48:12 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Ridley Added doorway to down storage room. Receps are existing. Added 3way switch by back door. Rough in ok
|
ELE20-00202
| Electrical Rough-In | 2/3/2020 | 2/4/2020 | 2/4/2020 9:28:52 AM | A | FAIL |
|
|
Good evening, the homeowner will not be home but the side gate and side door to the addition will be open. This is for the rough in for the addition, the rough in for the kitchen remodel was already completed as well as the service upgrade. Please let me know if you have any questions! Thank you, Dan Phone #: ###-#### Inspection requested via web by Dan Jennings 334.30 Flat NM cables shall not be securred on edge. 300.4D Cables shall not be secured less than 1 1/4in from face of framing. (Master bath 3 gang, Side entry 2 gang, Back slider 2 gang, Fan/ Fan light 2 gang)
|
ELE20-00210
| Electrical Rough-In | 2/3/2020 | 2/4/2020 | 2/4/2020 9:25:53 AM | A | PASS |
|
|
Remaining underground for pool panel feeder Phone #: ###-#### Inspection requested via web by Lars Johnson Remaining underground ok to cover
|
ELE20-00380
| Temporary Service | 2/3/2020 | 2/4/2020 | 2/4/2020 8:56:47 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe t/s u/g n ok
|
ELE20-00379
| Temporary Service | 2/3/2020 | 2/4/2020 | 2/4/2020 8:56:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe t/s u/g n ok
|
ELE20-00378
| Temporary Service | 2/3/2020 | 2/4/2020 | 2/4/2020 8:56:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe t/s u/g n ok
|
ELE20-00390
| Temporary Service | 2/3/2020 | 2/4/2020 | 2/4/2020 8:55:59 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe t/s u/g n ok
|
ELE20-00352
| Temporary Service | 2/3/2020 | 2/4/2020 | 2/4/2020 8:45:44 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe t/s u/g n ok
|