ELE19-00238
| Final | 2/28/2019 | 3/1/2019 | 3/1/2019 2:40:52 PM | P | PASS |
|
|
If possible please call 30mins before so I can make sure there’s access. Final inspection for service change. Panel labeled, added AFCIs for beds, IBT installed. Phone #: ###-#### Inspection requested via web by Nic Arnold Final ok
|
ELE18-04570
| Permanent Service | 3/1/2019 | 3/1/2019 | 3/1/2019 2:40:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by mike brown 21 meters p/s u/g n ok
|
ELE18-04734
| Final | 3/1/2019 | 3/1/2019 | 3/1/2019 12:33:00 PM | P | PASS |
|
|
garage code 1957e Phone #: ###-#### Inspection requested via web by Alan Lusk Final ok
|
ELE18-04462
| Final | 2/28/2019 | 3/1/2019 | 3/1/2019 12:32:35 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin blackmon Final ok
|
ELE18-01503
| Final | 2/28/2019 | 3/1/2019 | 3/1/2019 10:59:07 AM | A | FAIL |
|
|
Martha Phone #: ###-#### 406.12 All dwelling unit receptacles shall be tamper resistant. 334.12 NM cable shall be protected from physical damage. Missing lights, Wires hanging out of walls. No inspection on floor heat before cover. Recomended an electrician come in and finish project as owner will be out of town till July.
|
ELE19-00271
| Final | 2/28/2019 | 3/1/2019 | 3/1/2019 10:57:51 AM | A | PASS |
|
|
floor heat in master Phone #: ###-#### Inspection requested via web by kevin blackmon Final ok
|
ELE18-01391
| Electrical Rough-In | 2/28/2019 | 3/1/2019 | 3/1/2019 9:05:25 AM | A | PASS |
|
|
Level 3 staff work station cabinet rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Walked through penthouse. Will recheck when elevator lobby and Rooftop condensor units are finished. Check grounding electrode conduit from transformer. Needs to be bonded at both ends as per 250.64E. 3rd floor nurse call stations ok to cover
|
ELE18-02982
| Final | 2/28/2019 | 3/1/2019 | 2/28/2019 2:23:37 PM | A | PASS |
|
|
Justin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg final ok
|