ELE17-03882
| ELE-Aging Inspection | 3/10/2020 | 3/10/2020 | 3/16/2020 6:40:11 AM | | DONE |
|
|
Scheduled sign final
|
ELE17-03181
| ELE-Aging Inspection | 3/10/2020 | 3/10/2020 | 3/13/2020 2:00:43 PM | | FAIL |
|
|
No final scheduled. Violation exhist
|
ELE19-01403
| Electrical Rough-In | 3/10/2020 | 3/10/2020 | 3/10/2020 2:30:35 PM | P | PASS |
|
|
Cover inspection for boxes and raceways in elevated deck pour L4-4. Phone #: ###-#### Inspection requested via web by John Mittleider Deck pour listed ok to cover
|
ELE20-00804
| Electrical Rough-In | 3/10/2020 | 3/10/2020 | 3/10/2020 2:01:36 PM | P | PASS |
|
|
Please call Butch @ ###-#### 30 minutes prior to your arrival - as he will meet you there
Thank you for your consideration of our request. Have a lovely day! Phone #: ###-#### Inspection requested via web by JENNY EMEL Master bath and bed wall ok to cover
|
ELE20-00556
| Electrical Rough-In | 3/9/2020 | 3/10/2020 | 3/10/2020 1:19:59 PM | P | PASS |
|
|
Please contact Bobby for inspection of pole bases for site lighting. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo 12 pole bases only ok to cover
|
ELE20-00297
| Final | 3/10/2020 | 3/10/2020 | 3/10/2020 12:36:31 PM | P | FAIL |
|
|
House is not occupied and key is on top of the meter base. Phone #: ###-#### Inspection requested via web by Kendra Lanham 210.8A6 Kitchen counter receps shall be GFCI protected. 422.31 Hood and Dishwasher need Disc./lockouts. 408.4 Circuit directory needed for garage panel. 110.3 Dead recep stair way half wall, Down laundry room, Bulbs beeded for Bath vanity and down front bed lights.
|
ELE20-00825
| Electrical Rough-In | 3/9/2020 | 3/10/2020 | 3/10/2020 12:33:45 PM | P | PASS |
|
|
Please call prior to arrival for access Phone #: ###-#### Inspection requested via web by Patrick Paz Kitchen only ok to cover
|
ELE20-00713
| Rough-In Permanent Service | 3/9/2020 | 3/10/2020 | 3/10/2020 11:23:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Rough in ok p/s u/g n ok
|
ELE19-03991
| Final | 3/9/2020 | 3/10/2020 | 3/10/2020 10:15:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Corrections made final ok
|
ELE20-00794
| Electrical Rough-In | 3/10/2020 | 3/10/2020 | 3/10/2020 10:06:47 AM | A | PASS |
|
|
Please give me a call if you have any questions. thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman 1st floor, M. Bath, laundry room, up hall bath ok to cover
|
ELE19-04516
| Electrical Rough-In | 3/9/2020 | 3/10/2020 | 3/10/2020 10:05:56 AM | A | PASS |
|
|
Under ground for A Electrical room Phone #: ###-#### Inspection requested via web by Stephanie Huston Underground from electrical room to fire riser room ok to cover
|
ELE19-04513
| Electrical Rough-In | 3/9/2020 | 3/10/2020 | 3/10/2020 10:05:03 AM | A | PASS |
|
|
3rd floor c area deck Phone #: ###-#### Inspection requested via web by Stephanie Huston 3rd floor deck ok to cover
|
ELE19-03769
| Final | 3/9/2020 | 3/10/2020 | 3/10/2020 9:08:16 AM | A | PASS |
|
|
PLEASE CALL ###-#### TO ENSURE ACCESS PRIOR TO ARRIVING. Please call Dakota @ ###-#### with any questions. Thank You! Phone #: ###-#### Inspection requested via web by William Salts final ok
|