ELE16-02520
| ELE-Aging Inspection | 4/1/2019 | 4/1/2019 | 4/2/2019 11:16:01 AM | | DONE |
|
|
Spoke to David. He will call for final soon.
|
ELE16-03148
| ELE-Aging Inspection | 4/1/2019 | 4/1/2019 | 4/2/2019 11:10:18 AM | | FAIL |
|
|
Spoke with Lars. He was unfamiliar with the job. No corrections have been made at this time.
|
ELE18-01391
| Final | 4/1/2019 | 4/1/2019 | 4/1/2019 2:49:16 PM | P | PART |
|
|
Contact Scott for Level 1, LL1 and LL3 walk down final inspection for all excluding electrical rooms on each floor and the parking on level 1. Phone #: ###-#### Inspection requested via web by Tom Betty 210.63 Heating and air conditioning equipment outlet. Recep shall be within 25ft of mini split condensor unit. Child care area needs recep trimmed. Kitchen needs GFCI protection and appliances installed. Faculty room checked and waiting for cubicals. All other areas checked and ready for final
|
ELE19-00166
| Electrical Rough-In | 4/1/2019 | 4/1/2019 | 4/1/2019 1:16:23 PM | P | PASS |
|
|
Kitchen remodel Phone #: ###-#### Inspection requested via web by Shaun Kirkman Kitchen only ok to cover
|
ELE19-00553
| Final | 4/1/2019 | 4/1/2019 | 4/1/2019 1:16:00 PM | P | PASS |
|
|
Please give me half an hour notice prior to inscpection to inure access. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Final ok
|
ELE19-00553
| Electrical Rough-In | 4/1/2019 | 4/1/2019 | 4/1/2019 1:15:42 PM | P | PASS |
|
|
Please give me half an hour notice prior to inscpection to inure access. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Rough in master bath ok to cover
|
ELE18-01857
| Final | 3/28/2019 | 4/1/2019 | 4/1/2019 9:54:47 AM | A | CANC |
|
|
Partial final 3rd and 2nd floor. Phone #: ###-#### Inspection requested via web by cris flores
|
ELE18-01857
| Electrical Rough-In | 4/1/2019 | 4/1/2019 | 4/1/2019 9:54:26 AM | P | PASS |
|
|
Partial final 3rd and 2nd floor. Phone #: ###-#### Inspection requested via web by cris flores 3rd floor hot check ok. Ready for final
|
ELE19-00460
| Electrical Rough-In | 3/31/2019 | 4/1/2019 | 4/1/2019 9:52:35 AM | A | PASS |
|
|
inspect driveway mats for concrete install so we can pour Phone #: ###-#### Inspection requested via web by kevin blackmon Driveway heat only ok to cover
|
ELE18-03881
| Electrical Rough-In | 3/29/2019 | 4/1/2019 | 4/1/2019 9:51:38 AM | A | PASS |
|
|
celing- Mark Phone #: ###-#### Drop ceilings only. Salon and restrooms not ready at this time. MC ok to be supported by grid wire as per D. Degrang.
|
ELE19-00623
| Electrical Rough-In | 3/31/2019 | 4/1/2019 | 4/1/2019 8:46:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Dillon Kitchen and up bath ok to cover
|
ELE19-00623
| Permanent Service | 4/1/2019 | 4/1/2019 | 4/1/2019 8:43:57 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Dillon p/s o/h rec ok
|
ELE19-01106
| Rough-In Permanent Service | 3/31/2019 | 4/1/2019 | 4/1/2019 8:21:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Heideman rough in ok p/s u/g n ok
|
ELE19-00623
| Electrical Rough-In | 3/27/2019 | 4/1/2019 | 3/31/2019 5:26:51 PM | P | CANC |
|
|
Kyle Phone #: ###-#### Inspection cancelled from web by: Kyle Dillon
|