Inspections for the day of: Tuesday, April 23, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Ady
TitleELE-INSPECTOR
Phone #914-4683
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-01391 Final4/22/20194/23/20194/23/2019 1:22:08 PMPPART
Finalize levels 1 and 2. Phone #: ###-#### Inspection requested via web by Tom Betty Area requested not accurate. Level 2 corrections made. Level 4 Circuits 4NLF 24,26 damaged. Room 268 Receps within 6ft of sink need GFCI protection. Level 5 lobby ready for final. Rooftop patio and Heat trace ok. Note: Items needed for final are, Level 1 kitchen, Level 2 Procedure lights, Level 3 procedure lights,Level 4 Circuits 4NLF 24,26 repair, Rm 268 GFCI protection, Procedure lights.
ELE18-03873 Electrical Rough-In4/23/20194/23/20194/23/2019 12:23:49 PMPPASS
Jose Phone #: ###-#### ceiling only ok to cover
ELE19-01348 Rough-In Permanent Service4/23/20194/23/20194/23/2019 11:42:00 AMAPASS
Phone #: ###-#### Inspection requested via web by Therrin Robertson rough in ok p/s u/g n ok
ELE19-01347 Rough-In Permanent Service4/23/20194/23/20194/23/2019 11:16:42 AMAPASS
Phone #: ###-#### Inspection requested via web by Therrin Robertson rough in ok to cover. p/s u/g n ok
ELE19-01416 Electrical Rough-In4/22/20194/23/20194/23/2019 11:10:11 AMAPASS
key is on right side of door under small rock next to wall Phone #: ###-#### Inspection requested via web by kevin blackmon Above panel and 2 front offices. Walls only ok to cover
ELE19-00939 Final4/22/20194/23/20194/23/2019 10:12:25 AMANH
homeowners will be there in the AM Phone #: ###-#### Inspection requested via web by A.M.E. Office No access recall
ELE19-00486 Final4/19/20194/23/20194/23/2019 10:02:18 AMAPASS
Garage code 1957e Phone #: ###-#### Inspection requested via web by Alan Lusk Final ok
ELE19-01435 Electrical Rough-In4/22/20194/23/20194/23/2019 9:38:14 AMAPASS
listing inspection for solar equipment.
Its a 5 panel solar addition to an existing array.
An installer will be on site to show panels and optimizers being used.
Give me a call on your way out.
The installer will be done with work, and just waiting, so the earlier the better!
Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King listing only ok
ELE19-01301 Electrical Rough-In4/22/20194/23/20194/23/2019 9:02:49 AMAPASS
Brian Prussia is contact. Building and Electrical rough inspection scheduled for the same time. Phone #: ###-#### Inspection requested via web by BRS Permitting Listing only ok Panel and disc. in back yard checked at rough in.
ELE19-00635 Electrical Rough-In4/22/20194/23/20194/23/2019 8:47:39 AMAPASS
We need a grid inspection. Tobias is the site contact, thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Correction made ceiling ok to cover