ELE19-03389
| Permanent Service | 9/13/2019 | 9/13/2019 | 9/13/2019 3:59:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender p/s o/h rec ok
|
ELE19-03420
| Electrical Rough-In | 9/13/2019 | 9/13/2019 | 9/13/2019 1:22:58 PM | P | PASS |
|
|
Jose Phone #: ###-#### Phase "1" only as Designated on site print. Walls and underground for conf. room recep OK to cover
|
ELE19-03467
| Conference | 9/13/2019 | 9/13/2019 | 9/13/2019 12:57:56 PM | P | DONE |
|
|
I believe that in order to add a circuit for the A/C local disconnect, I''ll likely have to install a new meter box first. Because of the existing conditions (ie. the fuse box, and how the overhead feed comes in) I''d like to get a chance to look at this with an inspector before starting out. Please call so I know when to be there, I''m about 20 minutes away. Phone #: ###-#### Inspection requested via web by Dan Hilke Service change needed. Fuse box is behind a Gas water heater and cannot be refed from All in one. It would change wiring configuration of fuse box from a main to a sub panel. Ok to remuve guts of fuse box and turn into J-box. Screw door closed so splices will not be accessable.
|
ELE17-03179
| Final | 9/13/2019 | 9/13/2019 | 9/13/2019 11:34:00 AM | P | PASS |
|
|
Sign final Final ok
|
ELE16-00044
| ELE-Aging Inspection | 9/13/2019 | 9/13/2019 | 9/13/2019 11:32:25 AM | | FAIL |
|
|
Multiple permits with no activity No responce to notice
|
ELE16-01045
| ELE-Aging Inspection | 9/13/2019 | 9/13/2019 | 9/13/2019 11:31:38 AM | | FAIL |
|
|
Need to call for final. No responce to notices
|
ELE17-02013
| ELE-Aging Inspection | 9/13/2019 | 9/13/2019 | 9/13/2019 11:30:44 AM | | DONE |
|
|
No activity. No conference. Need to call cor inspection
|
ELE16-00597
| ELE-Aging Inspection | 9/13/2019 | 9/13/2019 | 9/13/2019 11:29:49 AM | | DONE |
|
|
No activity
|
ELE19-03426
| Final | 9/12/2019 | 9/13/2019 | 9/13/2019 11:27:23 AM | A | PASS |
|
|
I will call in the morning to schedule a time to meet you onsite. Phone #: ###-#### Inspection requested via web by Jesse Simpson Final ok
|
ELE19-03426
| Electrical Rough-In | 9/13/2019 | 9/13/2019 | 9/13/2019 11:27:13 AM | P | PASS |
|
|
I will call in the morning to schedule a time to meet you onsite. Phone #: ###-#### Inspection requested via web by Jesse Simpson Panel listing ok
|
ELE19-03101
| Electrical Rough-In | 9/12/2019 | 9/13/2019 | 9/13/2019 10:26:54 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Youngberg Owner rerouted some wires and added power for mini split. OK to cover
|
ELE19-03449
| Final | 9/12/2019 | 9/13/2019 | 9/13/2019 10:12:28 AM | A | PASS |
|
|
wirirng outside mini split Phone #: ###-#### Inspection requested via web by Barbara Szurgot Final ok
|
ELE19-03449
| Electrical Rough-In | 9/13/2019 | 9/13/2019 | 9/13/2019 10:12:19 AM | P | PASS |
|
|
wirirng outside mini split Phone #: ###-#### Inspection requested via web by Barbara Szurgot Rough in ok
|
ELE19-03447
| Temporary Service | 9/12/2019 | 9/13/2019 | 9/13/2019 9:59:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud t/s u/g n ok
|
ELE19-03451
| Temporary Service | 9/12/2019 | 9/13/2019 | 9/13/2019 9:00:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|