ELE15-02317
| Electrical Rough-In | 10/9/2015 | 10/9/2015 | 10/9/2015 3:00:58 PM | P | PASS |
|
|
EQ bonding plane wiring Phone #: ###-#### Inspection requested via web by Lars Johnson eq. plane ground ok to cover
|
ELE12-02026
| ELE-Aging Inspection | 10/9/2015 | 10/9/2015 | 10/9/2015 2:45:07 PM | | DONE |
|
|
still waiting for Chris to call this in
|
ELE12-02027
| ELE-Aging Inspection | 10/9/2015 | 10/9/2015 | 10/9/2015 2:43:52 PM | | DONE |
|
|
still waiting for them to call this in
|
ELE15-02863
| Electrical Rough-In | 10/9/2015 | 10/9/2015 | 10/9/2015 2:36:59 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher r/i corridor wall ok
|
ELE15-02138
| Final | 10/9/2015 | 10/9/2015 | 10/9/2015 2:10:36 PM | P | FAIL |
|
|
This Is All Ready And The Garage Code Is 1835 Call With Any Questions Or Cocerns Thanks Phone #: ###-#### Inspection requested via web by jason shifflett Lockoff on circuit breakers for hood NEC 422.31(C), dishwasher NEC 422.33(A) and dbl. oven NEC 422.31(B). please update panel schedule
|
ELE15-02052
| Final | 10/8/2015 | 10/9/2015 | 10/9/2015 1:34:06 PM | P | PASS |
|
|
Final Inspection request. Tim ###-#### Phone #: ###-#### Inspection requested via web by Tim Lawrence final ok
|
ELE15-03076
| Conference | 10/9/2015 | 10/9/2015 | 10/9/2015 1:14:26 PM | P | DONE |
|
|
we are changing the main feeders out monday night and are requesting a conference before hand. steve is on site today please stop by for a quick consult. thanks Phone #: ###-#### Inspection requested via web by Don Lustig discuss service upgrade requirements, grounding (add rod) , or find existing in addition to water pipe. Label available fault current on pull box, Meet wire bending and wire fill in existing gutter.
|
ELE15-03076
| Permanent Service | 10/9/2015 | 10/9/2015 | 10/9/2015 1:12:08 PM | P | PASS |
|
|
we are changing the main feeders out monday night and are requesting a conference before hand. steve is on site today please stop by for a quick consult. thanks Phone #: ###-#### Inspection requested via web by Don Lustig p/s u/g rec ok ok to re energize service. Inspected existing service ground to be re used for upgrade on 10/9/15. Will add supplemental ground rod as per conference. Will label pull box with available fault current as per conference. Contractor will be doing shutdown after hours. City of Boise will inspect following morning after work completed.
|
ELE15-03180
| Final | 10/8/2015 | 10/9/2015 | 10/9/2015 11:13:26 AM | A | PASS |
|
|
Replaced fuses as requested on correction. Phone #: ###-#### Inspection requested via web by Rick Beckman corrections made final ok
|
ELE15-03008
| Final | 10/8/2015 | 10/9/2015 | 10/9/2015 10:24:47 AM | A | NR |
|
|
Dan Phone #: ###-#### cubicles still being installed. not ready
|
ELE15-03007
| Electrical Rough-In | 10/8/2015 | 10/9/2015 | 10/9/2015 9:55:12 AM | A | PASS |
|
|
Dan Hommel Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i soffit at counter ok
|
ELE15-02409
| Final | 10/8/2015 | 10/9/2015 | 10/9/2015 9:51:53 AM | A | CANC |
|
|
Inspection requested via web by Terry Scott cancelled by Terry S
|
ELE15-03124
| Final | 10/8/2015 | 10/9/2015 | 10/9/2015 9:28:07 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by PAT MILLER final ok
|
GCE15-00139
| GCE-Final | 10/8/2015 | 10/9/2015 | 10/9/2015 8:52:20 AM | A | PASS |
|
|
Roger ###-#### final ok
|
GCE15-00154
| GCE-Rough-In Permanent Service | 10/8/2015 | 10/9/2015 | 10/9/2015 8:28:28 AM | A | PASS |
|
|
David ###-#### r/i ok p/s u/g n ok
|