Inspections for the day of: Monday, March 31, 2014.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRex Boyles
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
GCE14-00048 GCE-Rough-In Permanent Service3/31/20143/31/20144/1/2014 9:17:09 AMPDONE
(Mandatory Inspection) Eric Brown ###-#### needed rough in only
ELE14-00585 Final3/30/20143/31/20143/31/2014 2:32:01 PMPPASS
Call Chris with questions. ###-#### Phone #: ###-#### >> Inspection requested via web by Cyndi Dale final ok
ELE14-00628 Temporary Service3/31/20143/31/20143/31/2014 2:08:21 PMPPASS
Kelly Phone #: ###-#### relocated 100amp subfeed to temp. pole for construction. no need for Idaho power service on garage
ELE14-00760 Temporary Service3/28/20143/31/20143/31/2014 1:35:42 PMPPASS
I would like the temp service Inspected Monday so I can restore Power to most of the house. thanks Kevin All-Star electric Phone #: ###-#### >> Inspection requested via web by Kevin Oderkirk t/s o/h n ok temp. power to 2 existing loadcenters from temp. service ok
GCE14-00047 GCE-Rough-In3/31/20143/31/20143/31/2014 1:01:37 PMPDONE
AARON ###-#### needed perm. service
GCE14-00047 GCE-Permanent Service3/31/20143/31/20143/31/2014 1:00:27 PMPPASS
AARON ###-#### p/s o/h n ok maintain min. 3foot above residence roof!
GCE14-00039 GCE-Rough-In3/31/20143/31/20143/31/2014 12:31:25 PMPCANC
Butch ###-#### not ready rain ruined sauna tubes
ELE13-02083 Electrical Rough-In3/28/20143/31/20143/31/2014 9:58:58 AMAPASS
SE stair tower. George morris is contact ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Pierce rough in decks ok to pour concrete
ELE14-00745 Electrical Rough-In3/27/20143/31/20143/31/2014 9:26:48 AMAPASS
AJ Phone #: ###-#### bathroom walls and ceiling ok to cover 1st floor
GCE14-00047 GCE-Rough-In3/28/20143/31/20143/31/2014 9:03:13 AMAFAIL
aaron ###-#### 250.52(A)(2)- bond service to building steel. 250.53(A)- grounding electrode system consisting of 2- ground rods required. 250.32(D) (2)-separate grounding electrode required for separate building consisting of more than one circuit.
ELE14-00534 Electrical Rough-In3/29/20143/31/20143/30/2014 6:06:18 PMPCANC
Cover inspection for floor heat in upstairs bathroom. Thank you!

Phone #: ###-#### >> Inspection requested via web by Adam Staigle Inspection cancelled from web by: Adam Staigle