ELE15-01226
| Final | 5/14/2015 | 5/14/2015 | 5/14/2015 3:43:52 PM | P | PASS |
|
|
Karen Phone #: ###-#### final ok
|
ELE14-01898
| Final | 5/14/2015 | 5/14/2015 | 5/14/2015 3:09:49 PM | P | DONE |
|
|
Inspection for exterior gazebo and master bath radiant floor - Jim Phone #: ###-#### this permit needs to be finaled out and Jim with capitol electric will pull new electrical permit for master bath and gazebo work still in progress
|
GCE15-00026
| GCE-Final | 5/14/2015 | 5/14/2015 | 5/14/2015 2:23:20 PM | P | PASS |
|
|
Mike ###-#### final ok
|
GCE15-00077
| GCE-Final | 5/14/2015 | 5/14/2015 | 5/14/2015 1:59:18 PM | P | CANC |
|
|
Todd ###-#### needed conference for now
|
GCE15-00077
| GCE-Courtesy | 5/14/2015 | 5/14/2015 | 5/14/2015 1:58:29 PM | P | DONE |
|
|
Todd ###-#### conference to discuss clean up of electrical system for new tenant. Asked electrical contractor to add grounding electrode and install new #6 to confirm earth ground. confirm building steel ground and water piping system to ground. Confirm separatly derived system grounded. Relocate existing loadcenter mounted at 7 or 8 foot down to meet height requirments. Strap conduits throughout building, install KO seal in unused openings, remove damaged conduits and boxes or repair where needed, install j boxes with covers on unused raceways, repair or replace damaged outlets and switches. May need to install exit signs and emergency egress lighting. Check with building inspector.
|
ELE14-03333
| Electrical Rough-In | 5/14/2015 | 5/14/2015 | 5/14/2015 1:04:30 PM | P | PASS |
|
|
Contact: Jeremy Thornock Phone #: ###-#### Inspection requested via web by Deb Gooden r/i clubhouse spa bonding ok Note: anchor bolts installed for decking need to be tie wired to steel cage inside pour for bonding purposes
|
ELE14-03334
| Electrical Rough-In | 5/14/2015 | 5/14/2015 | 5/14/2015 11:51:49 AM | A | PASS |
|
|
Contact: Jeremy Thornock Phone #: ###-#### Inspection requested via web by Deb Gooden r/i partial parking garage ceiling ok except entrance area not ready.
|
ELE14-01963
| Permanent Service | 5/13/2015 | 5/14/2015 | 5/14/2015 11:15:18 AM | A | PASS |
|
|
Permanent service for HSB, drop ceilings 2nd floor east. Phone #: ###-#### Inspection requested via web by Rafael Castillo p/s u/g n ok west service "HSB" only
|
ELE14-01963
| Electrical Rough-In | 5/14/2015 | 5/14/2015 | 5/14/2015 11:13:26 AM | P | PASS |
|
|
Permanent service for HSB, drop ceilings 2nd floor east. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i ok drop ceilings in rms. 210 and 216. Also r/i ok vent. shaft mc supports in rms. 221 thru224, 226 thru230 and 240 and 241
|
ELE15-01407
| Electrical Rough-In | 5/13/2015 | 5/14/2015 | 5/14/2015 10:16:40 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Surerus r/i ok
|
ELE15-00664
| Final | 5/13/2015 | 5/14/2015 | 5/14/2015 9:59:35 AM | A | PASS |
|
|
This is a reinspection for a final. Call jeff for questions Phone #: ###-#### Inspection requested via web by Andrea Creek NOTE: see corrections from 5/13/15 on "temporary power" permit. Wrong permit called in yesterday. corrections made final ok
|
ELE15-01408
| Electrical Rough-In | 5/13/2015 | 5/14/2015 | 5/14/2015 9:27:21 AM | A | PASS |
|
|
Inspection is for rough in for sheet rock cover. Will do service change on different permit. Phone #: ###-#### Inspection requested via web by Brian Hughes r/i ok upst. and downstairs
|
GCE14-00201
| GCE-Final | 5/13/2015 | 5/14/2015 | 5/14/2015 8:54:28 AM | A | PASS |
|
|
Jackie ###-#### final ok
|