ELE16-01327
| Electrical Rough-In | 5/6/2016 | 5/6/2016 | 5/6/2016 4:48:10 PM | P | FAIL |
|
|
Steve. Ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy 300.11(A)(1)-identify seismic to troffers with distinguishable tags or colored wire.
|
ELE16-00104
| Final | 5/6/2016 | 5/6/2016 | 5/6/2016 4:19:30 PM | P | PASS |
|
|
Late afternoon if possible - Jay Phone #: ###-#### final ok
|
ELE16-01464
| Electrical Rough-In | 5/6/2016 | 5/6/2016 | 5/6/2016 3:26:03 PM | P | PASS |
|
|
Approve for cover in slab. Phone #: ###-#### Inspection requested via web by Kevin Burke r/i underslab conduits and floor box ok
|
ELE16-00825
| Final | 5/6/2016 | 5/6/2016 | 5/6/2016 2:23:29 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI 225.31-separate bldg.shall have disconnect on that bldg. 422.31-fixed appliances shall have lockable disconnect if not in sight of appliance
|
ELE16-00823
| Final | 5/6/2016 | 5/6/2016 | 5/6/2016 2:18:07 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI 225.31- separate bldg. shall have disconnecting means. 422.31-fixed appliances shall have lockable disconnect if not in sight of disconnect.
|
ELE16-00387
| Final | 5/6/2016 | 5/6/2016 | 5/6/2016 1:02:49 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald final ok
|
ELE16-01080
| Final | 5/5/2016 | 5/6/2016 | 5/6/2016 12:03:19 PM | P | PASS |
|
|
We are requesting a final inspection for tomorrow May 6th in the afternoon. Our contact is Julian @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate corrections made final ok
|
ELE13-02506
| ELE-Aging Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 11:36:11 AM | | DONE |
|
|
too busy
|
ELE13-02508
| ELE-Aging Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 11:35:39 AM | | DONE |
|
|
too busy
|
ELE12-00850
| ELE-Aging Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 11:34:58 AM | | DONE |
|
|
too busy
|
ELE16-01416
| Electrical Rough-In | 5/5/2016 | 5/6/2016 | 5/6/2016 10:03:09 AM | A | PASS |
|
|
Pool bonding. Please arrive after 9:00 to give us time to install approved bonding clamps Phone #: ###-#### Inspection requested via web by Emmet Bushman rated clamps ok r/i bonding ok
|
ELE16-01183
| Electrical Rough-In | 5/5/2016 | 5/6/2016 | 5/6/2016 9:39:30 AM | A | PASS |
|
|
Inspect hall bath floor heat. Phone #: ###-#### Inspection requested via web by Terry Scott r/i ok
|
ELE16-01459
| Electrical Rough-In | 5/5/2016 | 5/6/2016 | 5/6/2016 9:10:26 AM | A | PASS |
|
|
PLEASE CALL WITH ANY QUESTIONS. Phone #: ###-#### Inspection requested via web by Garrett Collins r/i kitchen ok
|
ELE16-01405
| Rough-In Permanent Service | 5/5/2016 | 5/6/2016 | 5/6/2016 8:54:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn r/i ok p/s u/g n ok
|
ELE16-01456
| Rough-In Permanent Service | 5/5/2016 | 5/6/2016 | 5/6/2016 8:38:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk r/i ok p/s u/g n ok
|
ELE16-01398
| Temporary Service | 5/6/2016 | 5/6/2016 | 5/6/2016 8:24:07 AM | A | PASS |
|
|
Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE16-01399
| Temporary Service | 5/6/2016 | 5/6/2016 | 5/6/2016 8:11:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE13-01291
| ELE-Aging Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 7:33:13 AM | | DONE |
|
|
still under construction
|
ELE16-01838
| Electrical Rough-In | 5/6/2016 | 5/6/2016 | 5/6/2016 12:00:00 AM | P | PASS |
|
|
Level 4 Stack 3 Lighting/Ceiling Level 6 643, 645 Phone #: ###-#### Inspection requested via web by Tom Betty level 4 stack3 ONLY ceilings ok not ready on level 6
|