PLM18-01971
| Plumbing Rough-in | 1/28/2019 | 1/28/2019 | 1/28/2019 4:34:09 PM | P | PART |
|
|
EAST BUILDING - if questions call Jesse @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann 4 units south end of east bld...........ds
|
PLM19-00386
| Final | 1/25/2019 | 1/28/2019 | 1/28/2019 4:31:57 PM | P | PASS |
|
|
Early PM - Please call Tyrel prior to arrival ###-#### Inspection requested via web by Arielle Hendricks
|
PLM19-00358
| Water and/or Sewer | 1/28/2019 | 1/28/2019 | 1/28/2019 4:10:54 PM | P | CANC |
|
|
Backflow has been replaced with proper type, and has been tested and tagged. Phone #: ###-#### Inspection requested via web by Stewart Galbraith
|
PLM19-00358
| Sprinkler (Final) | 1/28/2019 | 1/28/2019 | 1/28/2019 4:10:30 PM | P | PASS |
|
|
Backflow has been replaced with proper type, and has been tested and tagged. Phone #: ###-#### Inspection requested via web by Stewart Galbraith
|
PLM18-04772
| Final | 1/28/2019 | 1/28/2019 | 1/28/2019 3:37:11 PM | P | PASS |
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
PLM19-00341
| Final | 1/24/2019 | 1/28/2019 | 1/28/2019 3:20:38 PM | P | PASS |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
PLM19-00332
| Plumbing Rough-in | 1/25/2019 | 1/28/2019 | 1/28/2019 3:09:16 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by PATTY KIRK
|
PLM19-00064
| Plumbing Rough-in | 1/28/2019 | 1/28/2019 | 1/28/2019 2:56:59 PM | P | PASS |
|
|
Tracy Phone #: ###-####
|
PLM19-00329
| Plumbing Rough-in | 1/28/2019 | 1/28/2019 | 1/28/2019 2:33:37 PM | P | FAIL |
|
|
Brian Phone #: ###-#### no test, waste and vent not installed to code.......ds
|
PLM18-04665
| Final | 1/28/2019 | 1/28/2019 | 1/28/2019 2:18:02 PM | P | CANC |
|
|
Mike Phone #: ###-####
|
PLM18-04665
| Plumbing Rough-in | 1/28/2019 | 1/28/2019 | 1/28/2019 2:17:54 PM | P | FAIL |
|
|
Mike Phone #: ###-#### Plumbing has several code infractions. Also need a BLD permit to continue with work on project. Stop work issued by BLD inspector.. Bld sewer shall be 4 inch with 4 in. C/O. doesnt meet cross sectional venting, fitting installed incorrectly and toilet not vented. Also water in cold spaces............ds
|
PLM19-00390
| Groundwork | 1/28/2019 | 1/28/2019 | 1/28/2019 1:27:52 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS
|
PLM19-00387
| Water and/or Sewer | 1/27/2019 | 1/28/2019 | 1/28/2019 10:50:35 AM | A | PART |
|
|
We or homeowners should be onsite if you need indoor access. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson spkler b/f needs tested............ds
|
PLM19-00388
| Groundwork | 1/26/2019 | 1/28/2019 | 1/28/2019 10:41:47 AM | A | PASS |
|
|
To the right of the front door there is a mailbox that has the key in it. We are only inspecting the groundwork in the basement at this time. Phone #: ###-#### Inspection requested via web by Andrew Wilde
|
PLM18-04866
| Final | 1/24/2019 | 1/28/2019 | 1/28/2019 10:23:59 AM | A | PASS |
|
|
Roger Elam site contact Phone #: ###-#### Inspection requested via web by RM Mechanical
|
PLM19-00155
| Plumbing Rough-in | 1/27/2019 | 1/28/2019 | 1/28/2019 10:07:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark Kelso
|
PLM18-04621
| Final | 1/25/2019 | 1/28/2019 | 1/28/2019 9:55:04 AM | A | PASS |
|
|
Mait Phone #: ###-#### Inspection requested via web by Jerry Downer
|
PLM19-00383
| Final | 1/25/2019 | 1/28/2019 | 1/28/2019 8:05:29 AM | A | CANC |
|
|
Inspection requested via web by casey lattimer
|
PLM18-01269
| PLM-Aging Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 7:54:44 AM | | PEND |
|
|
no calls
|
PLM18-01289
| PLM-Aging Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 7:54:06 AM | | PEND |
|
|
no activity
|