Inspections for the day of: Wednesday, January 16, 2019.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrian Scoles
TitleMEC INSPECTOR
Phone #914-4915
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC18-06023 Rough-in1/16/20191/16/20191/16/2019 4:03:13 PMPPART
Partial inspection. We were not able to penetrate the roof for safety reasons. We will be back to finish when roof is not slick. Phone #: ###-#### Inspection requested via web by Dan Otero- framing needs completed- 4" and 6" pipes need to be seucured/strapped in chase- need to finish roof penetrations- need to finish fire caulking- flue needs clearance to combustibles second floor chase and supported- all piping needs supported to manufactures ionstallation instructions- ok to cover rest of house excluding 2nd floor attic space and chases on all levels around fireplace- talked with building inspector about this he is aware
MEC19-00206 Final1/14/20191/16/20191/16/2019 3:34:03 PMPPASS
ALSO ###-####
INSTALLER DAVID ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace co ok
MEC19-00204 Rough-in1/15/20191/16/20191/16/2019 3:05:11 PMPPASS
And pressure test flue please. Thx Phone #: ###-#### Inspection requested via web by Aaron Toomey- R/I ok- will look at line set at final in crawl still installing- 5lb flue test pass
MEC19-00207 Final1/15/20191/16/20191/16/2019 2:35:13 PMPNR
Please call Dave prior to arrival ###-#### Inspection requested via web by Arielle Hendricks- furnace coil ok- still need to set and run all of the a/c - reschedule when completed
MEC19-00207 Pressure Test1/16/20191/16/20191/16/2019 2:32:07 PMPPASS
Please call Dave prior to arrival ###-#### Inspection requested via web by Arielle Hendricks- 5lb flue test pass for water heater and furnace
MEC18-05630 Final1/9/20191/16/20191/16/2019 2:12:18 PMPPASS
Please call client prior to arrival at ###-####
Thank you Phone #: ###-#### Inspection requested via web by Andrea Grigsby- furnace a/c coil co ok
MEC19-00238 Final1/16/20191/16/20191/16/2019 1:29:05 PMPPASS
MEC19-00238 Pressure Test1/16/20191/16/20191/16/2019 1:28:06 PMPPASS
Inspection requested via web by Floyd Floyd Peek- 20lb gas pass to range co ok
MEC19-00173 Pressure Test1/15/20191/16/20191/16/2019 11:18:11 AMAPASS
Please inspect pressure on gas line for cooktop in kitchen. Gas line is ran from existing line in basement. Also please inspect new hood exhaust in kitchen. Phone #: ###-#### Inspection requested via web by Gary Duncan- 20lb gas pass to range from furnace location
MEC19-00173 Rough-in1/16/20191/16/20191/16/2019 11:14:06 AMAPASS
Please inspect pressure on gas line for cooktop in kitchen. Gas line is ran from existing line in basement. Also please inspect new hood exhaust in kitchen. Phone #: ###-#### Inspection requested via web by Gary Duncan- range hood ducting ok to cover
MEC19-00024 Final1/11/20191/16/20191/16/2019 10:00:35 AMAPASS
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace co ok
MEC19-00139 Final1/15/20191/16/20191/16/2019 9:31:15 AMAPASS
PLEASE CALL HOMEOWNER STACI WHEN 30 MINS IN ROUTE Phone #: ###-#### Inspection requested via web by Rick Montgomery- furnace a/c coil co ok
MEC19-00232 Final1/16/20191/16/20191/16/2019 8:53:38 AMAPASS
MEC19-00232 Pressure Test1/15/20191/16/20191/16/2019 8:53:12 AMAPASS
Please call homeowner Jamie at ###-#### before inspection for access to home they are living in the house. Thank You Phone #: ###-#### Inspection requested via web by Russ Curtis- 20lb gas pass co ok
MEC18-05243 Final1/15/20191/16/20191/16/2019 8:21:08 AMAPASS
DUCT WORK ADDITION WAS ADDED AND PAID FOR ON PERMIT, SORRY THAT WAS MISSED AND I DID NOT SEE YOUR PREVIOUS INSPECTION NOTES, THAT IS CORRECTED AND SET FOR FINAL TO CLOSE OUT PERMIT. I LEFT MY NUMBER IF THERE ARE ANY ISSUES, MY NAME IS STEVE DALE WITH DIAMOND HEATING Phone #: ###-#### Inspection requested via web by Rick Montgomery- furnace a/c coil supply ans return ducting co ok